PT_S13的W1_07.pptVIP

  1. 1、本文档共35页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Agenda: Day Two Unit Objectives State why physical data is useful during top-level integration State what is SDF data State the three parasitic models PrimeTime accepts State the precedence of back-annotated data Why Use Physical Data? Timing Convergence The goal is to achieve timing convergence with the physical tools Without timing convergence, there may be many iterations between the logical and physical tools before timing closure! Execute top-level integration with available physical data Prelayout, timing analysis performed based on wire load models Postlayout, replace wire load models with actual net parasitic data The Limitation of Wire Load Models The “Cost” of Estimating Net Delays In large geometries, net delay was only a small portion of a path’s total delay Estimating the timing of a “low impact” portion of the circuit is OK In smaller geometries, delays due to net capacitance are a large portion of the path delay Introduction to Physical Data Parasitic versus SDF SDF back-annotation is used to describe net and cell delays No cell or net delay calculation by PT - a “frozen” snapshot Parasitic back-annotation is used to describe net resistance and capacitance (RC). RCs are used for Performing design rule analysis (for example, max_capacitance) Computation of cell and net delays if no SDF is annotated Using SDF will be faster than delay calculation with parasitics For multiple analyses on the same netlist, use PT to generate SDF for subsequent runs report_timing with Physical Data Back-Annotation Command Summary read_sdf report_annotated_delay, report_annotated_check remove_annotated_delay, remove_annotated_check read_parasitics report_annotated_parasitics remove_annotated_parasitics Parasitic Back-Annotation Different Parasitic Formats set_load/set_resistance -- Lumped RC Model SPEF -- Standard Parasitic Exchange Format (IEEE standard) RSPF -- Reduced Standard Parasitic Format DSPF -- Detailed Standard Parasitic Format Lumped RC Data More o

文档评论(0)

daixuefei + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档