(笔译实习文章.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
(笔译实习文章

English to Chinese 原文 Planning Techniques A number of people require plans of varying complexity for varying purposes. In the construction industry the types of planners can be grouped by the role their organization plays in the construction process. In this way there are three types of planners: the client organization; the engineers/architects or designers; and the contractors. The Client The client organization is interested in the plan of the overall project from the acquisition of the land to the use of the facility. Primarily the client organization is interested in determining the times of outflows of cash for which it has to make provision and in the overall strategic decisions of the projects management. The client will operate with activities whose durations are likely to be weeks or months rather than days. Major decisions, such as the type of contract which may range from a traditional form with design and construction running sequentially to design/construct forms where design and construction overlap, will have an impact on the overall duration of the project and the client s cash flows and will be examined using the overall project plan. Another example of the use of the project plan will be the client s decision on whether to proceed with procurement of mechanical/electrical plant, before construction contracts are signed, the procurement times and the overall project duration being the key factors in such decisions. The client organization will rely heavily on the project s plan or program as a decision aid when considering these and other strategic issues. Later the client organization will use the project s plan to monitor progress. The Designers The engineers in the case of civil engineering projects or the architects in the case of building projects or the project manager, if appointed, will normally carry the responsibility for preparing the plans used by the client in taking the strategic decisions described above. In addition

文档评论(0)

dafangjia + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档