ppt课件-diasnummer1-sjfartsverket.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ppt课件-diasnummer1-sjfartsverket

International Hydrographic Organization NHC 57th meeting Agenda item April 15-17, 2013 Sweden Worldwide ENC Database Working Group (WEND-WG) report THIRD MEETING OF THE WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG3) 13-14 May 2013, IHB, Monaco 4. Guidelines for the implementation of the WEND principles 5. WENDWG Risk Assessment Tool Task Group (Terms of Reference, conclusions, etc) 6. List of ports not covered by larger scale ENCs 7. Policy and procedures to verify consistency between ENCs and the corresponding paper charts 8. Development of a policy to address the withdrawal of ENCs and nautical publications after they are issued 9. Development of a Performance Monitoring Procedure 10. The requirement for an IHB ENC reference (library) collection 11. Capacity Building Project for short-term Secondments to RENCs 12. Development of an IHO RENC/WENC 13. Development of the 2013 WENDWG Work Programme 17. Election of the next Chair and Vice Chair WENDWG 3: Guidelines of Implementation of WEND Principles. - None remarks received so far. - Are these guidelines suitable for NHC members? Ports not covered by large scale ENCs ?This analysis is available on IHO web pages (/mtg_docs/com_wg/WEND/WEND-WG2/Gaps-overlaps/GapsOverlaps.htm ) WEND-WG2 discussed on coverage. It was found that the UKHO analysis was based on inaccurate source data. For NHC there are reported some ports without ENC coverage. For most of those ports belonging also to BSHC area, BSHC have reported that these are based on incorrect source data (coordinates) and actually they are covered with ENCs. We need to clarify if all these NHC ports are covered. New documents are not yet available (but mentioned in the draft WEND-WG3? Agenda) WEND-WG2 Action 5 requests RHC feedback by 18 April 2013. Gaps and overlaps - NHC: Gaps and overlaps - NHC: Gaps and overlaps - NHC: Gaps and overlaps - NHC: Gaps and overlaps - NHC: WENDWG3 There are many W

文档评论(0)

heti94575 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档