- 1、本文档共109页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
高尔夫球场草坪管理摘要
Best Management Practices on the Golf Course Dr. Matt Fagerness KSU Turfgrass Extension Golf Courses are Vulnerable to: Soil erosion (especially during grow-in) Surface runoff (rain, uneven irrigation) Movement of fertilizer and pesticides offsite Improper use of fertilizers and pesticides This Seminar: Is not intended to criticize course management practices Is intended to offer new perspective(s) on familiar concepts Will hopefully increase awareness of the many practices which affect golf course ecosystems Seminar Breakdown Part I: Basics of Best Management Practices Part II: Integrated Pest Management Part III: Practical Applications of IPM Environmental and Pest Monitoring Pesticide Selection Criteria Applicable Strategies for Reducing Pesticide Input Part I: What are BMPs? Practices implemented before and during management to protect natural resources both on and off the golf course. Four Primary Goals of BMPs: 1) Identify potential for and reduce or eliminate offsite transport of sediment, nutrient, and pesticides. 2) Use strategic, biological, and mechanical soil and water conservation practices 3) Control the rate, method, and types of inputs used 4) Reduce total chemical use through an IPM approach Goals of BMPs 1) Identify potential for and reduce or eliminate offsite transport of sediment, nutrient, and pesticides. (LU, SP) 2) Use strategic, biological, and mechanical soil and water conservation practices 3) Control the rate, method, and types of inputs used 4) Reduce total chemical use through an IPM approach Environmental Planning A proactive environmental approach to golf course construction and management can mitigate future problems. Step I: examine characteristics of the site Step II: identify site’s position relative to watershed drainage basins Step III: identify environmentally sensitive areas Step IV: determine management practices which will help protect sensitive areas Step I: Site Description Topography Major surface water features st
您可能关注的文档
- 高大模板专项方案(专家论证过)摘要.doc
- 高大模板细则摘要.doc
- 高大的皂荚树摘要.ppt
- 常见的化学反应课件全解.ppt
- 常见的化学小魔术全解.doc
- 常见的化学计算题全解.ppt
- 高宏Chapter3A摘要.ppt
- 高容量血液滤过治疗项目可行性报告摘要.doc
- 高宏Chapter4A摘要.ppt
- 高宏Chapter2A摘要.ppt
- 2024函授本科自我鉴定模板汇编七篇.pdf
- 2024年山西省运城市小升初六年级数学应用题专项冲刺一卷含答案及解析.pdf
- 2024年人教版九年级下册英语期末综合检测试卷及答案.pdf
- 2024年初一生物的教学反思(三篇).pdf
- 2023计算机四级网络工程师巩固试题.pdf
- 2024初中物理中考经典高频考点历年真题测试卷 (4055).pdf
- 2024国家开放大学电大《公共行政学》形考作业.pdf
- 2024年公用设备工程师之(暖通空调+动力)基础知识每日一练试卷A卷含答案.pdf
- 2024届山东省济宁市曲阜市重点达标名校中考适应性考试生物试题含解析.pdf
- 2024年中考一轮复习人教版九年级化学知识点梳理全套.pdf
文档评论(0)