设计说明书 万震解析.docx

  1. 1、本文档共58页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
摘要本设计为金泉铁矿选矿厂的初步设计,设计规模为20000吨/日。矿石中主要有用矿物为磁铁矿,主要脉石矿物为石英、白云石和方解石。矿石的平均品位为TFe 35%。设计中破碎采用三段一闭路流程,粗碎颚式破碎机最大给矿粒度1000mm,细筛圆振筛控制产品粒度为10mm。一段磨矿,螺旋分级,分级溢流产品中-0.074mm占65%。用一粗、一精、一扫,铁的回收率90%,铁精矿的品位65%。精矿采用磁力脱水槽浓缩、陶瓷过滤机过滤的方法脱水,铁精矿的水分含量为9%;尾矿经过浓缩后,进入尾矿库,部分工艺用水经过净化后回用。设计内容包括工艺流程计算、设备选型,并绘制了选矿厂厂房配置图、单机及配置图、工艺流程数质量流程图等。关键词: 磁铁矿; 磁选; 选矿工艺流程; 选矿厂; 初步设计AbstractThe Jonquilironoreconcentrator had been designed, which could deal with 20,000 tons magnetite per day. The?mainusefulmineralintheore was magnetite, and themaingangueminerals were quartz, dolomite and?calcite.?And the?averagegrade?of?magnetite was 35%.There was three-stage?processin?crushing, and at the last stage, closed circuit was used. Jaw crusher was used in coarse crushing, which was able tohandle?themaximumfeedsize?of?1000mm. Vibrating feeder which could control?the productparticle size of?10mm was used in the process of fine screen. Then one-stage closed circuit grinding and spiral classifier was selected,?and?the classification overflow?of the magnetite was 65%?in-0.074mm. In order to elect?the?magnetite concentrate,one-stageroughing、one-stageconcentration and one-stage scavenging were used. The recovery of magnetite was 90%, and the concentrate grade of magnetite was 65%. To concentrate magnetite, the magnetic dewater cone was selected, and the ceramic filter was used to dewatering. The water content of magnetite concentrate was 9%. The tailings?after?concentrated were placed in the tailing pond, and part of?process water was purified?and?recycled.The content of design included?process?calculations and equipment selection. Andconcentrator?plant?configuration?map、?equipment?configuration diagram、the quantity and the?quality?flowcharts of process were drown.Key words: Magnetite; Magnetic separation; Beneficiation process; Concentrator; Preliminary design目录1 绪论11.1 设计依据11.2 建厂的重要性11.3 设计内容12 概论22.1 建厂地区概况22.1.1 厂区地理位置及交通22.1.2 厂区气候22.1.3 厂区地震资料22.1.4 厂区经济情况22.1.5 厂区环境保护32.2 矿区建设概述32.3 地质与矿床32.3.1 矿床发现、

文档评论(0)

little28 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档