- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
This diagram shows what happens when you migrate storage in vSphere 4. First, upon initiating a migration, vSphere copies all virtual machine files except the disks from the old virtual machine directory to a new directory on the destination datastore. Second, vSphere enables Changed Block Tracking on the virtual machine’s disk. Changed block tracking tracks changes to the disk so that vSphere knows which regions of the disk include data. vSphere stores this data in a bitmap that can reside either in memory or as a file. For Storage VMotion, vSphere usually keep the change bitmap in memory, but for simplicity we’ve shown it next to the disk on the source datastore. Third, vSphere “pre-copies” the virtual machine’s disk and swap file from the disk on the source to the disk on the destination. During this time, the virtual machine is running and may be writing to its disk. Therefore, some regions of the disk change and must be resent. This is where changed block tracking comes in. vSphere first copies the contents of the entire disk to the destination; this is the first pre-copy iteration. It then queries the changed block tracking module to determine what regions of the disk were written to during the first iteration. vSphere performs a second iteration of pre-copy, only copying those regions that were changed during the first iteration. Typically the number of changed regions is significantly smaller than the total size of the disk, so the second iteration takes significantly less time. vSphere continues pre-copying until the amount of modified data is small enough to be copied very quickly. Fourth, ESX invokes fast suspend/resume on the virtual machine. Fast suspend/resume does exactly what its name implies: the virtual machine is quickly suspended and resumed, with the new virtual machine process using the destination virtual machine home and disks. Before ESX allows the new virtual machine to start running again, the final changed regions of the source disk
您可能关注的文档
- 2016最新实用标准公文格式讲稿.doc
- 2015职业卫生技术服务机构培训讲课解说.ppt
- 2016最新水运工程常用表式(监理、施工用表)讲稿.doc
- 2015中考安康解说.ppt
- 2017版《优化重组卷》大一轮生物复习精练(全国通用):单元卷9+植物的激素调节讲稿.doc
- LED工艺-SMD工艺-PLCC工艺解说.ppt
- LED基本知识简介解说.ppt
- 2015中考第一轮复习第24讲相似、投影、视图解说.ppt
- 2015中考复习思品考1-2珍爱和尊重生命解说.ppt
- LED路灯节能照明改造方案解说.ppt
- 深度解析(2026)《ISO 22002-12025食品安全前提方案—第1部分:食品制造》.pptx
- 深度解析(2026)《ISO 22002-52025食品安全前提方案—第5部分:运输和储存》.pptx
- 深度解析(2026)《ISO 22002-42025 食品安全前提方案 — 第4部分:食品包装制造》.pptx
- 徒步活动策划方案.doc
- 深度解析(2026)《ISO 22002-62025食品安全前提方案—第6部分:饲料及动物食品生产》.pptx
- 2026年新版郯城期末真题卷.doc
- 深度解析(2026)《ISO 22476-72012岩土工程勘察与测试 — 现场测试 — 第7部分:钻孔千斤顶试验》.pptx
- 深度解析(2026)《ISO 22090-22014 船舶与海洋技术 — 航向传送装置(THD) — 第2部分:地磁原理》.pptx
- 深度解析(2026)《ISO 23584-22012 光学和光子学 — 参考字典规范 — 第 2 部分:类与特性定义》:构建智能制造数据基石的专家视角与未来展望.pptx
- 深度解析(2026)《ISO 22932-92025 Mining — Vocabulary — Part 9 Drainage》:构建未来矿山“水脉”治理与可持续发展的新语言体系.pptx
最近下载
- 江苏省2022年高中学业水平合格考生物试卷真题(精校打印).docx VIP
- 湖南女子学院《高等数学A》2025-2026学年期末考试试卷(A)卷.docx VIP
- Q∕GDW 13236.10-2019 导、地线采购标准 第10部分:钢芯耐热铝合金绞线专用技术规范.docx VIP
- 2024国家广播电视总局无线电台管理局招聘职位表下载.xls『180人』笔试备考题库及答案解析.docx VIP
- 城市排水管网雨污分流效果评价技术导则.pdf VIP
- Q∕GDW 13236.9-2019 导、地线采购标准 第9部分:铝合金绞线专用技术规范.docx VIP
- 2025年民族地区数字经济基础设施建设分析及未来五年发展趋势报告.docx
- 图文制作服务 投标方案(技术方案).doc VIP
- 西华大学《MATLAB与系统仿真》2023-2024学年第一学期期末试卷.doc VIP
- J502-2内装修-室内吊顶.pdf VIP
原创力文档


文档评论(0)