- 57
- 0
- 约 96页
- 2017-02-10 发布于湖北
- 举报
吊装起重作业安全培训PPT课件讲解
* * * The reason for left hand or right hand lay is to accommodate the different winch designs from various manufacturers. The end of the winch to which the rope is anchored and the direction of winch loading each effect the decision of which lay is the correct lay. The incorrect lay will result in rapid wear of the rope, increased number of broken wires and difficulty in maintaining an orderly laying of the rope onto the winch drum. Has any class member ever experienced problems with a FSWR when trying to wind it onto a winch drum? The most probable cause is that it was the wrong direction
您可能关注的文档
最近下载
- 2025年教育技术学专业研究生入学考试试题及答案.docx VIP
- 2022年陕师大研究生入学考试教育技术学专业试题.doc VIP
- 05R417-1室内管道支吊架(高清版).docx VIP
- 七年级下册湖南地方文化常识教案 .pdf VIP
- 瓜豆原理【模型专题】.docx VIP
- QGDW 11009-2021 电能计量封印技术规范.docx VIP
- 2023年8月26日全国事业单位联考D类《职业能力倾向测验》真题(含答案).docx VIP
- 东风风神-AX7-产品使用说明书-风神AX7 2015款 2.0L MT智逸型-DFM6470D5A-东风风神AX7使用手册201410.pdf VIP
- 《声环境质量自动监测技术规范》DB44T 753—2025(广东标准).pdf
- 2024年中考数学二轮培优专题 几何最值模型之费马点模型(原卷版+解析版).pdf VIP
原创力文档

文档评论(0)