- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
北京朝阳区高考英语阅读理解二轮精练6含答案
北京朝阳区2016高考英语阅读理解(二轮)精练(6)含答案
【2016模拟题】阅读下列短文,从每题所给的四个选项(A、B、C和D)中,选出最佳选项。According to the US government, wind farms off the Pacific coast could produce 900 gigawatts of electricity every year. Unfortunately, the water there is far too deep for even the tallest windmills to touch bottom. An experiment under way off the coast of Norway, however, could help put them anywhere.
The project, called Hywind, is the world’s first large-scale deepwater wind turbine (涡轮发电机). Although it uses a fairly standard 152-ton, 2. 3-megawatt turbine, Hywind represents totally new technology. The turbine will be fixed 213 feet above the water on a floating spar, a technology Hywind’s creator, the Norwegian company StatoilHydro, has developed recently. The steel spar, which is filled with stones and goes 328 feet below the sea surface, will be tied to the ocean floor by three cables ; these will keep the spar stable and prevent the turbine from moving up and down in the waves. Hywind’s stability in the cold and rough sea would prove that even the deepest corners of the ocean are suitable for wind power. If all goes according to the plan, the turbine will start producing electricity six miles off the coast of southwestern Norway as early as September.
To produce electricity on a large scale, a commercial wind farm will have to use bigger turbines than Hywind does, but it’s difficult enough to balance such a large turbine so high on a floating spar in the middle of the ocean. To make that turbine heavier, the whole spar抯 c,enter of gravity must be moved much closer to the ocean’s surface. To do that, the company plans to design a new kind of wind turbine, one whose gearbox (变速箱) sits at sea level rather than behind the blades.
Hywind is a test run, but the benefits for perfecting floating wind-farm technology could be extremely large. Out at sea, the wind is often stronger and steadier than close to shore, where all existing offshore windmills are planted. Deep-sea farms are in
您可能关注的文档
- 内蒙古元宝山区平煤高级中学高中数学人教版必修二同步检测:第一章空间几何体Word版含答案.doc
- 内蒙古元宝山区平煤高级中学高中数学人教版必修二同步课件:3.3直线的交点坐标与距离公式1共16张PPT.ppt
- 内蒙古元宝山区平煤高级中学高中数学人教版必修二同步检测:期末综合测试题Word版含答案.doc
- 内蒙古巴彦淖尔市一中高三上学期期末考试文综地理试题Word版含答案.doc
- 内蒙古元宝山区平煤高级中学高中数学人教版必修二同步课件:3.3第2节直线的交点坐标与距离公式2共18张PPT.ppt
- 内蒙古巴彦淖尔市一中高三上学期期末考试文综政治试题Word版含答案.doc
- 内蒙古巴彦淖尔市一中高三上学期期末考试文综历史试题Word版含答案.doc
- 内蒙古巴彦淖尔市一中高三上学期期末考试理综化学试题Word版含答案.doc
- 内蒙古巴彦淖尔市一中高三上学期期末考试理综生物试题Word版含答案.doc
- 内蒙古巴彦淖尔市一中高三上学期期末考试理综物理试题Word版含答案.doc
- 北京西城区高考英语二轮完形填空选编1含答案.doc
- 北京西城区高考英语二轮阅读理解选编1含答案.doc
- 北京西城区高考英语二轮完形填空选编5含答案.doc
- 北京西城区高考英语二轮阅读理解选编2含答案.doc
- 北京西城区高考英语二轮阅读理解选编6含答案.doc
- 北京西城区高考英语二轮阅读理解选编7含答案.doc
- 北京西城区高考英语二轮阅读理解选编3含答案.doc
- 北师大版英语必修三配套学案及练习:Unit7SectionⅡ知能演练轻松闯关Word版含答案.doc
- 北师大版英语必修三配套学案及练习:Unit7SectionⅠ知能演练轻松闯关Word版含答案.doc
- 北师大版英语必修三配套学案及练习:Unit7SectionⅠWarm-up&Lesson1Word版含答案.doc
文档评论(0)