网站大量收购独家精品文档,联系QQ:2885784924

Sample Project1_工作计划_计划解决方案_实用文档.pptVIP

Sample Project1_工作计划_计划解决方案_实用文档.ppt

  1. 1、本文档共40页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Sample Project1_工作计划_计划解决方案_实用文档.ppt

Analyze - Summary Problem Validated Causes White residue Temperature profile Solder paste Contamination Solder paste Temperature profile (Oven) Fixture fixing Splash Solder paste Fixture fixing Tombstone/IC bridge Temperature profile Solder paste Fixture fixing Connector solder bridge Stencil Connector solder missing Paste missing after connector installation Stencil Improve – Solution White residue/Contamination/Splash Solution: - Apply new type solder paste The result is proven in analysis phase Has little impact on process and improvement on sigma level Price of new paste is lower Need customer approval, may take long time Adjust temperature profile Can use DOE to find out the best setting May cause some defective products in production during DOE Improve – Solution Tombstone/IC bridge Solution: Apply new type solder paste Can be merged in solution for white residue/contamination Fine tune temperature profile (DOE) Can be merged in solution for white residue/contamination Amend fixture to improve fixing Need change all fixture in use, can be merged in the fixture replacement Also good for fixing in washing Improve – Solution Connector Solder Bridge Solution: Change stencil aperture design Order a new stencil and cost is RMB2500 Same design is proven applicable at other company Adjust the base plate to make printing carrier flat The adjustment depends on experience of operator/engineer Can be monitored by thickness measurement No cost issue Improve – Solution Connector Solder Missing Solution: Adjust after connector installation Need not change process setting Add an operation and improve HPU The operator may ignore it if in mass production Improve paste thickness Order a new stencil and cost is RMB2500. Romulus and Neptune will be EOL, can start from new programs Same design is proven applicable in other company Control – Determine Implementation New Solder Paste - Pilot run and approval Control lot for MSL analysis and Assy1 p

文档评论(0)

kfcel5889 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档