Water jet correction.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Water jet correction: shaft sinking slowly on the side of the caisson external injection pressure of water around the outer wall, and make its soil mud, to reduce the resistance of soil. When rectifying to close to the normal position to stop water jet, and the open caisson with sand filling the gap between soil and the outer wall. Wells caused by edge foot side is stopped by the barrier, with conduit of shot hole is dug in below the boulder, charging will boulder crushing. Resulting from the well abandon or pile soil, take will well abandon or pile soil removal. After the completion of the open caisson sinking allowable deviation Projects allow deviation Edge foot deviation of average height and design elevation 100 mm Edge foot horizontal axis deviation 1/100 h (mm) Blade in any of the four corners of the foot two feet ground elevation difference Angle blade 1/100 b and 300 mm or less 8.3.5.6 open caisson bottom sealing When the open caisson sinking to the design elevation, after 8 hours accumulated subsidence observation is not more than 10 mm, which should be open caisson bottom sealing process. This project open caisson adopts undrained back cover (underwater concrete bottom sealing). Back before, will base the content such as mud, sediment was removed. The underwater concrete bottom sealing, underwater concrete, concrete pipe is commonly used in construction. Catheter for steel flange can be connected with the short tube, flange spool each section 1.0 m long, 300 mm in diameter. Before pouring underwater bottom sealing concrete, concrete pipe according to the preset position accurately placed in open caisson. Catheter bottom subsoil based distance from well than the ball plug big 5-10 cm in diameter. Catheter effective radius is 3 m or so commonly, its decorate all pipe casting area covered each other, the corner or the blanks can be added a catheter. With lead wire in intraductal capture put the ball slightly smaller than the tube diameter, plug (

文档评论(0)

taotao0c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档