- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
山东建筑大学毕业设计外文文献及译文
山东建筑大学毕业设计外文文献及译文
- 1 –
外文文献:
GRAPHICAL-BASED MULTISTAGE SCHEDULING METHOD FOR RC BUILDINGS
Y. C. HUANG
Department of Construction Management, Hwa Hsia Institute of Technology and Commerce, 111 Hwa Hsin Street,Chung Ho City, Taipei Hsien, Taiwan, Republic of China
Received 13 February 2004; accepted 4 March 2005
In Taiwan, contractors are becoming specialized in certain types of construction in an increasingly competitive environment and this specialization requires some scheduling models to provide better scheduling results for each type of construction. A new practical method, Graphical-Based Multistage Scheduling Method (GMSM),for scheduling RC building superstructures is presented herein. From the analysis of characteristics and construction custom of RC buildings, four constraints, (a) down–up construction, (b) building inspection, (c) reuse of beam forms, and (d) reuse of slab forms, can be established. The GMSM is developed utilizing a graphical-based method and the concept of resource reuse, and the general form of the GMSM to be facilely implemented in any worksheet software is derived as well. The results of this study provide some quantitative information as a useful guide for scheduling RC building superstructures.
Keywords: Multistage scheduling, repetitive project, RC building, GMSM
Introduction
In Taiwan, contractors are becoming specialized in certain types of construction in an increasingly competitive environment and this specialization requires some scheduling models to provide a better scheduling for each type of construction. The majority of high-rise buildings located in urban areas in Taiwan are RC structures. It is deemed crucial for high-rise buildings that a scheduling model for this type of construction can not only increase profits but also reduce the impact on urban traffic.
Of the high-rise buildings constructed to date, the network planning technique has been commonly adopted in scheduling. The Critical Path Method (CPM) is the
您可能关注的文档
- 小车C1驾照考试科目二(场地考试技巧精华整理.doc
- 小麦草.doc
- 小麦的虫害.doc
- 尤集中心学校开展教师教育教学理论专著学习指定书目.doc
- 就业指导与创业基础期末考试.doc
- 尔雅课(从“愚昧”到“科学”科学技术简史)3.doc
- 就业指导大纲.doc
- 尺寸换算(纸张及照片 英寸 英尺 厘米).doc
- 尺和厘米换算和文胸测量.doc
- 就地压力表管理规定.doc
- 北师大版五年级数学上册第3单元倍数与因数 单元教学设计 .pdf
- 日照高新技术产业开发区考选工作人员考试真题 .pdf
- 小学三年级下册信息技术教案 .pdf
- 名校教研联盟2025届高考模拟试题训练(8.29-8.30) 政治试卷 .pdf
- 安全考核规章制度细则 .pdf
- 《新世纪大学英语综合教程》 (2) 秦秀白编 (第2版)复习资料 .pdf
- 【高中政治】2025版新高考版《考点考法清单》考点清单+考法清单专题九认识社会与价值选择 .pdf
- 中国在全球人工智能版图中的崛起专题研究:社会影响与伦理挑战 .pdf
- 三年级生命生态与安全教案 .pdf
- 第三单元【速记清单】七年级语文上册单元速记巧练 .pdf
文档评论(0)