- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
山东建筑大学毕业设计外文文献及译文
山东建筑大学毕业设计外文文献及译文
- 1 –
外文文献:
GRAPHICAL-BASED MULTISTAGE SCHEDULING METHOD FOR RC BUILDINGS
Y. C. HUANG
Department of Construction Management, Hwa Hsia Institute of Technology and Commerce, 111 Hwa Hsin Street,Chung Ho City, Taipei Hsien, Taiwan, Republic of China
Received 13 February 2004; accepted 4 March 2005
In Taiwan, contractors are becoming specialized in certain types of construction in an increasingly competitive environment and this specialization requires some scheduling models to provide better scheduling results for each type of construction. A new practical method, Graphical-Based Multistage Scheduling Method (GMSM),for scheduling RC building superstructures is presented herein. From the analysis of characteristics and construction custom of RC buildings, four constraints, (a) down–up construction, (b) building inspection, (c) reuse of beam forms, and (d) reuse of slab forms, can be established. The GMSM is developed utilizing a graphical-based method and the concept of resource reuse, and the general form of the GMSM to be facilely implemented in any worksheet software is derived as well. The results of this study provide some quantitative information as a useful guide for scheduling RC building superstructures.
Keywords: Multistage scheduling, repetitive project, RC building, GMSM
Introduction
In Taiwan, contractors are becoming specialized in certain types of construction in an increasingly competitive environment and this specialization requires some scheduling models to provide a better scheduling for each type of construction. The majority of high-rise buildings located in urban areas in Taiwan are RC structures. It is deemed crucial for high-rise buildings that a scheduling model for this type of construction can not only increase profits but also reduce the impact on urban traffic.
Of the high-rise buildings constructed to date, the network planning technique has been commonly adopted in scheduling. The Critical Path Method (CPM) is the
文档评论(0)