- 1、本文档共35页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
数据中心新思维-C114中国通信网
36”cold aisle provides the same level of IT serviceability that our customers would find in their data centers. There is enough room to remove and replace IT gear. The cold aisle can be set to run at 90 degrees Fahrenheit – well within the specifications of industry standard IT equipment. This saves energy needed to cool the POD. Since this isn’t meant to be a workspace, people shouldn’t spend too much time in here. The customer can choose a lower temperature if they like. 50U racks allows for up to 5 c7000 blade enclosure per rack. The hot aisle is 17” wide. Rear rack access is provide by several sets of double doors on the hot aisle. All panels (BMS, fan control, humidifier, etc) are accessed from outside the POD to reduce human traffic inside the POD. Human error is the most common cause of datacenter down time. The heat exchangers run in parallel and the blower fans are variable speed, allowing for greater energy efficiency. Cooling Water: 240 gal/min; 55 – 75F; 20 – 25 psi Domestic Water for Humidifier: 1 gal/hr; 30-80 psi Power: 800A, 480v, 3 phase delta, 3 wire + ground, 60 Hz (transformer is needed to provide 415v to the POD) BMS stands for Building Management System; centrally controls, monitors and optimizes heating, air-conditioning, lighting and security for facilities Lower limit for temperature range (-20F) assumes minimal IT load (~100kW) is running in the POD to generate heat. Non-operating temperature range is 35F to 130F. HP POD Infrastructure Services Overview HP can assist you with POD solution assessment and design, installation and startup, data center planning, training, and ongoing support. Factory Express (see next slide) On Site Implementation HP provides expert onsite deployment assistance for easy setup and installation Our end-to-end services include integrated onsite services for HP POD solution deployment that take the pressure off your employees and cover all the deployment activities you need to get your new HP POD hardware,
文档评论(0)