Before masonry wall at the grass【DOC精选】.docVIP

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Before masonry wall at the grass-roots level should experience qualified, floors, dust and debris protruding part shall be cleared away. , play on structure wall, column 2 + 1000 mm elevation, horizontal axis pop-up masonry on the beam, board, block wall edge, the position of the Windows and doors hole size, and indicate the door, humanly scaled starting point is relatively high. 3, masonry material approach must be kind, specifications, varieties, neatly stacked, layout reasonable, safe and clean. Steam concrete block to the scene should try to reduce the transit times will block the on-demand consumption directly transferred to the construction elevator, build by laying bricks or stones wall place, near the loading and unloading process, it is forbidden to throw and dumping. Approach, the stacking height less than 2 m, stacked in outdoor, to cover the rain prevention measures. 4, reserved iron, pipe should be installed ahead of schedule. 5, before the construction, should enter the scene of the block model, quantity and quality of the construction and equipment used in the acceptance. Masonry to block water, the day before the moisture content of block should not be greater than 15%, lime-sand brick requires infiltration depth of 8 ~ 10 mm. Build by laying bricks or stones to should take put down gently, in the process of fast handling to avoid damage, and should not be secondary handling. 6, plaster before the formal handover formalities related to take cover engineering unit, prevent the rework. 7, the concrete lintel, ring beam and concrete column, beam surface protruding part pointed out flat, honeycomb, pits, will, loose part pointed out the way, brush and adhesiveness slurry. Then, use 1:3 cement mortar screeding the stratification. Exposed steel head, iron filar silk and wood to eliminate, swallow the windowsill brick, wall and floor slab and beam bottom junction application of lime-sand brick build by laying bricks or stones is lacking. 8, pipe wall

文档评论(0)

taotao0b + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档