网站大量收购独家精品文档,联系QQ:2885784924

Cable fixed【DOC精选】.doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Cable fixed (4) cable fixed 1) the vertical laying cable cable or greater than 45 ℃ tilt fixed on each bracket. 1) the vertical laying cable, cable, or greater than 45 ℃ tilt fixed on each bracket. 2) ac single core cable or each phase after the split phase cable fixed clamp and support, not form a closed ferromagnetic loops. 2) ac single core cable or each phase after the split phase cable fixed clamp and support, not form a closed ferromagnetic loops. 3) cable order, little cross. 3) cable order, little cross. 4) when required by the design without, cables and pipelines of the minimum interval conforms to the requirements, and under the flammable and explosive gas pipeline laying. 4) the when required by the design without, cables and pipelines of the minimum interval conforms to the requirements, and under the flammable and explosive gas pipeline laying. (5) the fire prevention measures: laying cable in cable trench and shaft, according to the design requirements of the position, make fire cut off. (5) the fire prevention measures: laying cable in cable trench and shaft, according to the design requirements of the position, make the fire cut off. (6) hanging signs (6) hanging signs 1) sign the specification should be consistent with anticorrosion performance, mount should be strong. 1) sign the specification should be consistent with the anticorrosion performance, mount should be strong. 2) sign should be marked on the cable number, specification, model, voltage grade and the starting position. 2) sign should be marked on the cable number, specification, model, voltage grade and the starting position. 3) along the cable tray at both ends of cable laying, bend, intersections should be hung signs, straight segment should be properly set up signs. 3) along the cable tray at both ends of cable laying, bend, intersections should be hung signs, straight segment should be properly set up signs. 4, tube cable laying 4, tube cable laying (1) check the pipeline (1) check t

文档评论(0)

taotao0b + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档