- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Galvanized pipe connected by threads or grooves, the surface of the galvanized layer destruction and exposed screw parts should be embalmed. Adopt welding and flange connection, the surface of the weld seam and heat affected area X inches should be secondary galvanized or anticorrosive processing.
4. The pipeline through the basement or underground structures outside wall, waterproof measures should be taken, of buildings to have strict waterproof requirement, must adopt flexible waterproof casing. Pipe in floor and wall bushing should be set up, the casing pipe should be is located in the centre, casing should not serve as pipe supports, shall not be installed in the casing, pipeline interface between pipe and casing application non-combustible insulation filling is close-grained, pipeline crossing the casing thermal barrier may not be disconnected. Set in the wall of the casing and the wall act the role of face flat on both sides, set up in the floor of the casing, the top 20 mm should be higher than that of external decoration, set in toilet or kitchen in the casing of the floor slab, the top should be higher than 50 mm ground adornment, should be at the bottom and the floor is flat.
5. Pipeline installation location, laying method, slope, slope direction should comply with the design and specification requirements. Condensed water pipe main slope should not be less than 0.8%, branch pipe slope should not be less than 1%. Condensed water and rainwater pipeline pipe shall not be connected to the sewage pipes.
6. The installation of valves, filters, water flow switch position comply with the design requirements, in line with the actual. Should be convenient for operation and observation, connection is firm, compact, installation direction should correctly, valve handle towards reasonable.
Third, ventilation and air conditioning engineering equipment installation requirements
1. The equipment are universal equipment, ventilation and air conditioning system in the co
您可能关注的文档
- furniture_exhibition_design 家具展厅设计【DOC精选】.doc
- FTP-Strict_LB_Routed_Mode【DOC精选】.doc
- FSK综合设计实验教材【DOC精选】.doc
- FT-说明书简化版【DOC精选】.doc
- FXQUDAO【DOC精选】.doc
- Future Generation Computer Systems The HPDMnet experiments validated the strengths of the basic HPDM【DOC精选】.doc
- G 第一节 多变的天气【DOC精选】.doc
- Galgame游戏新手上路指导【DOC精选】.doc
- F等价关系与聚类分析【DOC精选】.doc
- Gallery D 源码分析汇总【DOC精选】.docx
最近下载
- 油田开发与分析研究知识问答汇编.doc VIP
- 2025陕西公需课党的二十届三中全会精神解读与高质量发展答案.docx VIP
- NFPA 110-2019 国外国际标准.pdf VIP
- 宿舍规章制度十条.docx VIP
- (2025)第九届全国中小学“学宪法、讲宪法”活动知识竞赛题库及答案.pdf VIP
- 严明党的纪律和规矩论述摘编.docx VIP
- 福建省福州第一中学2024-2025学年高一下学期第四学段模块考试(7月期末)数学试题(含部分答案).pdf
- DB36∕T 1601-2022 猪场粪污异位发酵处理技术规程.pdf VIP
- 甘肃白银有色集团股份有限公司招聘真题.docx VIP
- 《科研基金申请撰写策略》课件.ppt VIP
文档评论(0)