KW烟风管吊装方案(译)【DOC精选】.doc

KW烟风管吊装方案(译)【DOC精选】.doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
KW烟风管吊装方案(译)【DOC精选】

Method Statement of Gas Duct Installation Works in WHG KW Project Document NO:CMIIC5-TNNY-T-S- Compilation: Audit: Approval: China Mechanical Industrial Fifth Engineering Construction Company May 2009 Method Statement of Gas Duct Installation Works In WHG KW Project General Information The WHG KW Project is designed by Conch and ACK. The project is mainly composed of one AQC boiler, one PH-A1 boiler, one PH-A2 boiler, one PH-N boiler, one Turbine Generator Set and outdoor steam/water piping. For the smoothing proceeding of gas duct and civil steel structure installation work, we prepared this method statement to ensure the safety. Main works are: PH-A2 boiler(without steam drum) outlet gas duct lifting; PH-A2 boiler(without steam drum) inlet gas duct lifting; PH-A1 boiler(with steam drum) outlet gas duct lifting; PH-A1 boiler(with steam drum) gas inlet lifting; PH-N boiler(with steam drum) outlet gas duct lifting; PH-N boiler(with steam drum) inlet gas duct lifting; Grate Cooler to pre-duster gas duct lifting; Pre-duster to AQC boiler gas duct lifting; AQC boiler outlet gas duct lifting; Grate Cooler to Kiln head electrical precipitator inlet gas duct lifting; Installation Principle Considering the big amount of gas duct, many of them are intercrossed, we will follow principle: Inside First outside Second, Bottom First Top second. In case of having to open a hole on the old gas duct or cut off, the existing gas duct will be temporarily fixed before lifting and installation. Installation Method Kiln Tail ( Pre-heater Tower) Gas Duct and Support Installation Lifting procedure a. For PH-N boiler gas duct and its support, Pre-heater Tower civil steel structure and PH-A1/2 boiler support do not cross each other, so they can be lifted in advance. b. There are four gas ducts in PH-A1/2 boiler, overlapped seriously, so the lifting order is very important. The order for the main componen

文档评论(0)

taotao0b + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档