laying cable【DOC精选】.doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
laying cable: A. put cable in the cable entrance hole well outside, use first installation has cable traction and coated with lubricating oil cable head of wire rope with the end of the cable connection, the other end of the rope through the cable pipe, dragging cable force uniform, check the cable drawing for jam phenomenon in the process, such as the tension is too large, should investigate the cause, problem solving, to continue pulling cable. B. power cable shall be separately through a tube hole. The same tube hole can wear into the three control cable. C. three-phase single-phase single core cable shall not wear alone or steel tube inside. 4) cable into the hole well: cable laying in the pipe, in order to draw cable or cable connection, cable branch pipe, bend, must be in accordance with the design requirements or specification requirements set cable hole Wells by hand, cable hole hole distance by hand, should be set according to design requirements, generally in the linear part of every 50 ~ 100 mm set a. 5) fire prevention measures: cable laying cable pipe, through fire zone position according to the design requirements, fire blocking measures. 6) cable signs: A. sign specification should be consistent with anti-corrosion performance, mount should be strong. B. sign should be marked on the cable number, specification, model, voltage grade and the starting position. C. along the cable pipe laying cable, hand hole Wells should be hung signs of both ends. (5) branch cable laying in the shaft A. Check the cable channels, confirm whether pre branch cable can pass through the hole. B. put cable wire racks, usually put cable downstairs, to lift up the cable when installing. C. the tip of the branch cable processing. D. the cable made of a special PVC material at the top of the head cap make waterproof processing, then use heat shrinkable tube. E. the metal net fixed at the top of the cable. F. will install metal mesh of the cable to the top through rotary joints wi

文档评论(0)

taotao0b + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档