laying cable:
A. put cable in the cable entrance hole well outside, use first installation has cable traction and coated with lubricating oil cable head of wire rope with the end of the cable connection, the other end of the rope through the cable pipe, dragging cable force uniform, check the cable drawing for jam phenomenon in the process, such as the tension is too large, should investigate the cause, problem solving, to continue pulling cable.
B. power cable shall be separately through a tube hole. The same tube hole can wear into the three control cable.
C. three-phase single-phase single core cable shall not wear alone or steel tube inside.
4) cable into the hole well: cable laying in the pipe, in order to draw cable or cable connection, cable branch pipe, bend, must be in accordance with the design requirements or specification requirements set cable hole Wells by hand, cable hole hole distance by hand, should be set according to design requirements, generally in the linear part of every 50 ~ 100 mm set a.
5) fire prevention measures: cable laying cable pipe, through fire zone position according to the design requirements, fire blocking measures.
6) cable signs:
A. sign specification should be consistent with anti-corrosion performance, mount should be strong.
B. sign should be marked on the cable number, specification, model, voltage grade and the starting position.
C. along the cable pipe laying cable, hand hole Wells should be hung signs of both ends.
(5) branch cable laying in the shaft
A. Check the cable channels, confirm whether pre branch cable can pass through the hole.
B. put cable wire racks, usually put cable downstairs, to lift up the cable when installing.
C. the tip of the branch cable processing.
D. the cable made of a special PVC material at the top of the head cap make waterproof processing, then use heat shrinkable tube.
E. the metal net fixed at the top of the cable.
F. will install metal mesh of the cable to the top through rotary joints wi
您可能关注的文档
- Key to unit 【DOC精选】.doc
- keys to listening book【DOC精选】.doc
- Keys to Unit 6【DOC精选】.doc
- Keys to Unit 【DOC精选】.doc
- KIDS BOX of Unit Favourite toys【DOC精选】.doc
- kiDemon9实验【DOC精选】.doc
- Keys_to_focus listening book 新编大学英语【DOC精选】.doc
- KK对话傅盛:互联网的下一个高潮在边缘领域【DOC精选】.doc
- KLL系列便携式地下水位【DOC精选】.doc
- KM_RESUME_brief_CV_【DOC精选】.doc
- 英语人教PEP版八年级(上册)Unit4+writing+写作.pptx
- 人美版美术四年级(上册)8 笔的世界 课件 (1).pptx
- 人美版美术七年级(上册)龙的制作.pptx
- 英语人教PEP版六年级(上册)Unit 2 第一课时.pptx
- 数学苏教版三年级(上册)3.3 长方形和正方形周长的计算 苏教版(共12张PPT).pptx
- 音乐人教版八年级(上册)青春舞曲 课件2.pptx
- 音乐人教版四年级(上册) 第一单元 音乐知识 附点四分音符|人教版.pptx
- 英语人教PEP版四年级(上册)Unit 6 Part B let's learn 1.pptx
- 道德与法治人教版二年级(上册)课件-3.11大家排好队部编版(共18张PPT).pptx
- 人美版美术七年级(上册)《黄山天下奇》课件1.pptx
文档评论(0)