- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
laying cable:
A. put cable in the cable entrance hole well outside, use first installation has cable traction and coated with lubricating oil cable head of wire rope with the end of the cable connection, the other end of the rope through the cable pipe, dragging cable force uniform, check the cable drawing for jam phenomenon in the process, such as the tension is too large, should investigate the cause, problem solving, to continue pulling cable.
B. power cable shall be separately through a tube hole. The same tube hole can wear into the three control cable.
C. three-phase single-phase single core cable shall not wear alone or steel tube inside.
4) cable into the hole well: cable laying in the pipe, in order to draw cable or cable connection, cable branch pipe, bend, must be in accordance with the design requirements or specification requirements set cable hole Wells by hand, cable hole hole distance by hand, should be set according to design requirements, generally in the linear part of every 50 ~ 100 mm set a.
5) fire prevention measures: cable laying cable pipe, through fire zone position according to the design requirements, fire blocking measures.
6) cable signs:
A. sign specification should be consistent with anti-corrosion performance, mount should be strong.
B. sign should be marked on the cable number, specification, model, voltage grade and the starting position.
C. along the cable pipe laying cable, hand hole Wells should be hung signs of both ends.
(5) branch cable laying in the shaft
A. Check the cable channels, confirm whether pre branch cable can pass through the hole.
B. put cable wire racks, usually put cable downstairs, to lift up the cable when installing.
C. the tip of the branch cable processing.
D. the cable made of a special PVC material at the top of the head cap make waterproof processing, then use heat shrinkable tube.
E. the metal net fixed at the top of the cable.
F. will install metal mesh of the cable to the top through rotary joints wi
您可能关注的文档
- Key to unit 【DOC精选】.doc
- keys to listening book【DOC精选】.doc
- Keys to Unit 6【DOC精选】.doc
- Keys to Unit 【DOC精选】.doc
- KIDS BOX of Unit Favourite toys【DOC精选】.doc
- kiDemon9实验【DOC精选】.doc
- Keys_to_focus listening book 新编大学英语【DOC精选】.doc
- KK对话傅盛:互联网的下一个高潮在边缘领域【DOC精选】.doc
- KLL系列便携式地下水位【DOC精选】.doc
- KM_RESUME_brief_CV_【DOC精选】.doc
- 2025徐汇区应急管理事务中心招聘应急值班值守考试参考题库及答案解析(夺冠).docx
- 2025忻州原平市招聘社区专职工作人员笔试备考题库附答案解析(夺冠).docx
- 2025忻州原平市招聘社区专职工作人员考试历年真题汇编附答案解析.docx
- 2025徐汇区应急管理事务中心招聘应急值班值守笔试备考题库附答案解析(夺冠).docx
- 2025忻州原平市招聘社区专职工作人员考试历年真题汇编附答案解析.docx
- 2025忻州原平市招聘社区专职工作人员考试历年真题汇编附答案解析.docx
- 养老护理中的质量管理与持续改进.pptx
- 小学数学:2024-2025学年北京市海淀区六年级(上)期末数学试卷(含参考答案).pdf
- 2025年光伏电站配套充电桩投资回报分析报告.docx
- 2025德州夏津县城乡投资发展集团有限公司权属子公司公开招聘(6名)备考题库含答案解析(夺冠).docx
最近下载
- 新版出口报关单模板.xls VIP
- 2021MAM-6070M空压机微电脑控制器.docx VIP
- 《北京中医药大学学报2010年第11期》.pdf VIP
- 年产10万吨聚羧酸系减水剂项目可行性研究报告.docx VIP
- 泵房设备安装方案.docx VIP
- GB∕T42430-2024血液、尿液中乙醇、甲醇、正丙醇、丙酮、异丙醇和正丁醇检验.pptx VIP
- 年南海区第十二届初中综合能力大赛数学模拟试题.pdf VIP
- 戴笠:政治侦探.pdf VIP
- 国开(SC)-数据库运维-形考3(考核内容:第5章~第7章,30%)-学习资料.docx VIP
- 中国视神经脊髓炎谱系疾病诊断与治疗指南解读PPT课件.pptx VIP
原创力文档


文档评论(0)