laying cable:
A. put cable in the cable entrance hole well outside, use first installation has cable traction and coated with lubricating oil cable head of wire rope with the end of the cable connection, the other end of the rope through the cable pipe, dragging cable force uniform, check the cable drawing for jam phenomenon in the process, such as the tension is too large, should investigate the cause, problem solving, to continue pulling cable.
B. power cable shall be separately through a tube hole. The same tube hole can wear into the three control cable.
C. three-phase single-phase single
您可能关注的文档
- Key to unit 【DOC精选】.doc
- keys to listening book【DOC精选】.doc
- Keys to Unit 6【DOC精选】.doc
- Keys to Unit 【DOC精选】.doc
- KIDS BOX of Unit Favourite toys【DOC精选】.doc
- kiDemon9实验【DOC精选】.doc
- Keys_to_focus listening book 新编大学英语【DOC精选】.doc
- KK对话傅盛:互联网的下一个高潮在边缘领域【DOC精选】.doc
- KLL系列便携式地下水位【DOC精选】.doc
- KM_RESUME_brief_CV_【DOC精选】.doc
最近下载
- 标准图集-22G101-2现浇混凝土板式楼梯.pdf VIP
- 《3-02-03-01消防员职业标准》.pdf VIP
- 《NBT 31117-2017 海上风电场交流海底电缆选型敷设技术导则》(2026年)实施指南.pptx VIP
- NBT 31117-2017海上风电场交流海底电缆选型敷设技术导则专题研究报告.pptx VIP
- 家庭治疗家谱图绘制.pptx VIP
- 04S516 混凝土排水管道基础及接口.docx
- 2026年临床执业助理医师《药理学》测试卷(含答案).docx
- 李白按年龄顺序写的诗.docx VIP
- 1.数据宝藏在身边(课件)-四年级信息科技全一册(人教版2024).pptx VIP
- 二级医院呼吸与危重症医学科规范化建设标准.doc VIP
原创力文档

文档评论(0)