PT PLN (PERSERO) Takalar Coal Fired Steam Power Plant Project 2*100MW Work Instruction Name of Work:Work Instruction for Causeway Serial No.:TKL-JZ-08-16 Prepared By:Takalar Project Civil Division Approved By: Safety: Quality: Construction: Reviewed By: Prepared By: Time:2016.04.17 Time:2016.04.16 Time:2016.04.15 Time:2016.04.14 Time:2016.04.13 Time:2016.04.13 Issuance Date 2016.04.17 Version 01 Table of Content 1 The Purpose of Works 3 1.1 The General Introduction and Scope of Work 3 1.2 Workdone quantity 4 1.3 Construction Schedule Request 4 2 Reference 4 3 Preparation and Condition for work 4 3.1 Technical Preparation 4 3.2 Workmen 5 3.3 Preparation for material and equipment 5 3.4 Main equipment 5 3.5 Working condition 5 4 Method statement and safety and quality control measures 6 4.1 General method statement 6 4.2 Working steps and method 6 5 Working quality standard and inspection request 10 5.1 Working quality standard 10 6 Technical document request: None 14 7 Identification of hazard source and precaution measures 14 7.1 Hazard source and precaution measures 14 7.2 Safety management and emergency measure during operation on the sea 16 7.3 Environmental factor list and precautious measures 17 8 Related calculation and analysis 17 9 Appendix of instruction 17 The Purpose of Works The General Introduction and Scope of Work This project is the causeway. The causeway lies to the north of water intake channel. It’s 552m long. The cross section is trapezoid, its top width is 11.9m and the base width is 32.5m. The ratio of slope is 1:2, and the slope is protected by rock and CIB. The construction of causeway includes soil improvement, core rock, rock bottom scour protection, armour stone two layers, 3t CIB and so on. One permanent work road and two retaining walls are set up on the causeway. The concrete surface is 250mm thick and the concrete grade is C30. The two retaining walls are made of ru

您可能关注的文档

文档评论(0)

希望之星 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档