- 1、本文档共55页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
本科毕业设计(论文)
题目:
本科毕业设计(论文)
题目:摘 要关键词:
Based On PLC,Program-controlled Coal Conveying System
Abstract
Thermal power plant coal conveying system is the guarantee of safe and reliable operation of the power plant boiler is very important support system, is mainly responsible for generating sets of coal unloading, storage and coal. How to ensure the reliability of equipment operation, reduce the operating and maintenance personnel the labor strength, improve the economic benefit, has become a topic worth studying. Programmable logic controller (PLC) is developing very rapidly in recent years, a wide application, microprocessor as the core, integrating microcomputer technology, automation technology and communication technology in the integration of general industrial control device. It has complete functions, convenient use, easy maintenance, strong commonality, high reliability, high ratio of performance to price, has been in the areas of industrial control is widely used and become a powerful tool to realize industrial automation.
This article is based on Siemens S7-200 PLC, program-controlled coal conveying system is designed. Between various devices are realized safety interlock protection control function: the coal conveying system motor start-stop is fairly strict control sequence. When starting, in order to avoid in front transport belt accident caused by the accumulation of coal material, system requirements inverse coal material flow direction in a certain time interval starting sequence. Stops in order not to make the transport belt accident, caused by residual coal feeding system requirements along the coal flow direction in a certain time interval sequence stops. PLC control system hardware design layout is reasonable, reliable work, convenient operation and maintenance, good work. With PLC program-controlled coal SPC system, not only has realized the automation of the equipment operation management and monitoring, to improve the reliability
您可能关注的文档
最近下载
- 小学体育_队列队形教学设计学情分析教材分析课后反思.doc
- 中建项目商务策划汇报模板.pptx
- 公路中小跨径钢-混组合梁桥标准图集(制订)》技术方案报告.docx
- “设计思维与方法”教案.ppt
- 大职赛生涯闯关参考答案.docx VIP
- 2022《美宜佳公司营运资金管理存在的问题及对策研究》开题报告文献综述(含提纲)3200字.docx VIP
- 长垣市人民医院西学中培训班《方剂学》考试.pdf VIP
- 苏教版一年级科学上册4.1《自然物与人造物》(课件).pptx
- 电子商务招聘简章模板.pdf
- 统编版小学语文二年级上册第六单元 先辈伟人 大单元整体学历案教案 教学设计附作业设计(基于新课标教学评一致性).docx
文档评论(0)