2015中南大学毕业设计模版.doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2015中南大学毕业设计模版

本科毕业设计(论文) GRADUATION DESIGN (THESIS) 题 目_基于OpenStack的__________ 学生姓名_____________________ 指导教师_____________________ 学 院_____________________ 专业班级_____________________ 本科生院制 2015年6月 年产50万吨MTO工厂设计 摘要 本项目为年产50万吨MTO工厂的初步设计。通过分析当前国内外MTO生产和研究现状,对生产工艺进行了选择论证。然后运用Aspen软件模拟初步的工艺流程,并通过对一系列工艺参数,如精馏塔的塔板数—产品纯度、进料塔板数—产品纯度、产品纯度—回流比、再沸器负荷—回流比等进行灵敏度分析,优化设备操作条件,提高工艺的合理性和经济性。本设计还针对工艺流程进行换热网络设计和对全局换热网络进行了优化和评估,通过内部流股之间相互换热以减少公用工程的消耗,最终优化后节约79.4%的热公用工程资源和73.7%的冷公用工程资源。本设计还运用水夹点技术优化了用水网络,根据水硬度分类处理水操作单元,并合理再生利用,使得本项目新鲜水用量和废水排放量达到最小,优化后的用水网络节约用水53.59%。本设计对于MTO工厂的生产和设计建造具有一定的现实指导意义。 关键词:工厂设计 灵敏度分析 能量衡算 夹点技术 动态控制 Design of a MTO plant with output of 500,000 tons ABSTRACT This project is the preliminary design of a MTO plant with an annual output of 500,000 tons of light olefins. Based on the current production and research situation all through the world, the production method was selected and demonstrated. Aspen software was used to simulate the preliminary process. Heat integration method was applied to optimize the heat exchange network. Rational heat exchange between process streams were suggested which resulted in the decreasing of utilities consumption and exchanger number. The heat integration leaded to energy saving of 79.4% of heat utilities and 73.7% of the cold utilities. In addition, the water pinch technology was also implemented to optimize the water network. The water operating unit was classified according to water hardness, with a reasonable recycling. The amount of fresh water consumption and wastewater emission was minimized. The optimized water network achieved 53.59% water saving. Finally, a preliminary economic analysis to the entire project was estimated in order to get the project construction cost and profitability. In summary, this design is of some practical significance for the production and design of the MTO industry. Key words:Plant design Sensitivity analysis Energy balance calculation

您可能关注的文档

文档评论(0)

haihang2017 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档