1. 1、本文档共30页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
bidformbidforbidformbidform

Bid Form TECHNICAL / COMMERCIAL (Instruction: Bidder to mark either Technical or Commercial) BASF-YPC SYNGAS PROJECT Package No : 31979 1430 01 Description of Package : PILING WORKS Address to : - SUBCONTRACT DEPARTMENT TECHNIP TIANCHEN CHEMICAL ENGINEERING CO. LTD. 5th Floor, Nanjing Chemical Industry Design Institute (NCIDI) 268#, Ge Guan Road, Dachang District Nanjing 210048 P.R.C Attn : MR Zhang Jie / MR K.Y. LEE It pertains to the BIDDER to verify that its bid is received by CONTRACTOR in due time and place. CONTENT OF BID The commercial package shall include as a minimum the following contents : No. Description Attachment to ITB Instructions 1 Form of Tender Bid Form 1 To be typed on Bidder’s own letterhead. Letter to be dated, company stamped and signed by authorised/legal representative of Bidder’s organisation. Power of attorney shall be attached to this letter. 2 The Price Summary Bid Form 2 Bidder to fill up completely and sign. 3 The Price Schedule duly filled in and completed Bid Form 3 Bidder to fill up completely and sign. 4 Exception and Deviations Bid Form 13 Bidder shall incorporate in this section the Bid Form 13 Exception and Deviations taken by bidder to this ITB. The form shall similar to that provided in the Technical proposal section. 5 Alternative Proposal that BIDDER has proposed Bid Form 4 Bidder to price the alternative that Bidder has proposed in the format provided. 6 Company Audited Financial Report for last 3 years nil Bidder to provide the audited financial of Bidder’s company for the last 3 years. The technical package shall include as a minimum the following contents: No. No Description Attachment to ITB Instructions 1 Executive Summary nil Bidder to outline and summarised his Technical proposal. 2 Method Statement Bid Form 5 The method statement outline in details Bidder’s method and sequence o

您可能关注的文档

文档评论(0)

ganqludp + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档