网站大量收购独家精品文档,联系QQ:2885784924

冷却塔计算书.docx

  1. 1、本文档共19页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
冷却塔计算书

Evonik Marco Polo一体化异氟尔酮及多用户基地冷却塔项目Support scaffold calculation脚手架计算书Composer编制:Inspection审核:Approval批准:Zhongshi Chemical Engineering Construction Co.,Ltd. Evonik Degussa Special Chemical (Shanghai)中石化工建设有限公司嬴创德固赛(上海)项目Year 2012, Month NOV.2012年11月 Support scaffold calculation支撑脚手架计算书Steel pipe scaffold calculation refer to the Construction Fastener Type Steel Pipe Scaffold Safety Technical Specifications (JGJ130-2011), the Code for Design of Building Foundation (GB 50007-2002), the Building Structure Load Standard (GB 50009-2001), the Steel Structure Design Standard (GB 50017-2003), and other norms.钢管脚手架的计算参照《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130-2011)、《建筑地基基础设计规范》(GB 50007-2002)、《建筑结构荷载规范》(GB 50009-2001)、《钢结构设计规范》(GB 50017-2003)等规范。1、Structure requirements构造要求(1)Poling: vertical and horizontal spacing 1.2×1.2 m, allowing the build-up deviation ± 5 cm, poling vertical degree allow build-up deviation ± 10 cm. The bottom shall set sweeping bar, from plate up to 20 cm, adopt butt extension. Extension length of sweeping bar in the end and poling junction over fastener less than or equal to 20cm.立杆:纵横向立杆间距1.2×1.2m,允许搭设偏差±5cm,立杆垂直度允许搭设偏差±10 cm。下部设扫地杆,扫地杆从垫板往上20 cm处设置,扫地杆采用对接接长。扫地杆在端头与立杆交接处伸出扣件长度不大于20cm。(2)Rail: set a full bidirectional horizontal bar between poling, vertical and horizontal tie beam step distance of 1.5 m, ensure it has enough design stiffness in two direction, rail with butt method extension, the elevation difference of a piece of rail on both ends not more than 2 cm, the planeness of longitudinal bar not less than ± 1 cm. To prevent level rail produce eccentric bend distance influence to poling rod, in the build-up formwork support, will rail symmetry and arrangement. Refer map below.横杆:立杆之间满设双向水平杆,纵横向水平拉杆步距1.2m,确保其在两个方向都具有足够的设计刚度,横杆用对接方法接长,一根横杆两端的高差,不能超过2 cm,纵向水平杆全长平整度不小于±1cm。为防止水平横杆对立杆产生偏心弯距的影响,在搭设模板支架时,将横杆对称相间布置。(3)Bracing: around the support set shear brace full, and should set up continuously.剪刀撑:沿支架四周外满设剪力撑,且应连续设置。(4)Joint node requirements: longitudinal bar

您可能关注的文档

文档评论(0)

haihang2017 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档