- 18
- 0
- 约2.1万字
- 约 17页
- 2017-03-04 发布于湖北
- 举报
Sample
Bill of Quantities工程量清单
A. Preamble 前言
1. The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, General and Special Conditions of Contract, Technical Specifications, and Drawings.
本工程量清单应连同投标人须知、合同的通用和专用条件、技术规范以及图纸一并进行阅读。
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given to provide a common basis for bidding. The basis of payment will be the actual quantities of work ordered and carried out, as measured by the Contractor and verified by the Engineer and valued at the rates and prices bid in the pri
原创力文档

文档评论(0)