- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
湖北红安县2017高考英语阅读理解一轮选练(三)及答案 Word版含解析.doc
湖北红安县2017高考英语阅读理解一轮选练(三)及答案
阅读下列四篇短文,从每小题后所给的A,B,C或D四个选项中,选出最佳选项。
According to the US government, wind farms off the Pacific coast could produce 900 gigawatts of electricity every year. Unfortunately, the water there is far too deep for even the tallest windmills (see picture) to touch bottom. An experiment under way off the coast of Norway, however, could help put them anywhere.
The project, called Hywind, is the world’s first large-scale deepwater wind turbine (涡轮发电机). Although it uses a fairly standard 152-ton, 2. 3-megawatt turbine, Hywind represents totally new technology. The turbine will be fixed 213 feet above the water on a floating spar(see picture), a technology Hywind’s creator, the Norwegian company StatoilHydro, has developed recently. The steel spar, which is filled with stones and goes 328 feet below the sea surface, will be tied to the ocean floor by three cables (缆索); these will keep the spar stable and prevent the turbine from moving up and down in the waves. Hywind’s stability (稳定性) in the cold and rough sea would prove that even the deepest corners of the ocean are suitable for wind power. If all goes according to plan, the turbine will start producing electricity six miles off the coast of southwestern Norway as early as September.
To produce electricity on a large scale, a commercial wind farm will have to use bigger turbines than Hywind does, but it’s difficult enough to balance such a large turbine so high on a floating spar in the middle of the ocean. To make that turbine heavier, the whole spar’s centre of gravity must be moved much closer to the ocean’s surface. To do that, the company plans to design a new kind of wind turbine, one whose gearbox (变速箱) sits at sea level rather than behind the blades (see picture).
Hywind is a test run, but the benefits for perfecting floating wind-farm technology could be extremely large. Out at sea, the wind is often stronger and steadier than close to shore, where all existing offshore windmills
您可能关注的文档
- 河南省安阳市龙安区2017届九年级语文上学期第一次月.doc
- 河南省安阳市龙安区2017届九年级语文上学期第二次月考试.doc
- 河南省师范大学附属中学2016-2017学年高二上学期期中考试化学试题 Word版含答案.doc
- 河南省师范大学附属中学2016-2017学年高二上学期期中考试历史试题 Word版含答案.doc
- 河南省师范大学附属中学2016-2017学年高二上学期期中考试政治试题 Word版含答案.doc
- 河南省平顶山市2017届九年级上期末数学试卷含答案解析.doc
- 河南省平顶山市叶县二中2016-2017学年高二上学期月考生物试卷(9月份) Word版含解析.doc
- 河南省洛阳市2017届九年级上期末物理试卷含答案解析.doc
- 河南省淮阳中学2016-2017学年高一上学期第一次周考历史试题 Word版含答案.doc
- 河南省漯河实验高中2017届高三上学期期中考试语文试题 Word版含答案.doc
- 湖北红安县2017高考英语阅读理解一轮选练(二)及答案 Word版含解析.doc
- 湖北红安县2017高考英语阅读理解一轮选练(五)及答案 Word版含解析.doc
- 湖北罗田县2017高考英语一轮阅读理解优编 Word版含解析.doc
- 湖北罗田县2017高考英语一轮阅读理解优编(一) Word版含解析.doc
- 湖北罗田县2017高考英语一轮阅读理解优编(二) Word版含解析.doc
- 湖北罗田县2017高考英语一轮阅读理解优编(五) Word版含解析.doc
- 湖北罗田县2017高考英语阅读理解一轮训练 Word版含解析.doc
- 湖北罗田县2017高考英语阅读理解一轮训练含参考答案 Word版含解析.doc
- 湖北罗田县2017高考英语阅读理解暑假练习及参考答案 Word版含解析.doc
- 湖北罗田县2017高考英语阅读理解暑假练习及答案 Word版含解析.doc
文档评论(0)