船舶试航

VMW437系泊及试航试验大纲 VMW437 PROGRAM OF DOCK TRIALS AND SEA TRIALS 第142 页 共 165页 序号 试验项目:航行试验 NO.: 4.0 TEST ITEM:SEA TRIALS 4.0.1海上试航所涉及的机电设备须先行在码头试车结束。 Sea trials of the ship are to be carried out after termination of dock trials of machinery and electric equipment which are to be tested at sea. 0.2试航前,设计部门根据船模压载状况,制定试航压载状态:艏吃水 约3.2米 ,艉吃水 约5.2米 ,并把试航的稳性计算提交GL船级社认可。 Detail ballast condition should be supplied by design department before sea trial acc. to that of ship model: fore draught about 3.2 m, aft-draught about 5.2m, and the stability calculation of sea trial should be handed over to GL Classification for approval. 0.3姊妹船的试航压载状态也将根据首制船认可资料进行配载。 Ballast condition of sea trial for sister vessels will be acc. to the approved data for first vessel. 0.4该船的试航应在现场验船师对试航船舶进行全面检查后,确认该船符合试航条件时方可 进行。 Sea trial of this vessel should be carried out after site surveyor has fully inspected the vessel and confirmed that it meets sea trial condition. 0.5航行试验时,对于船上的设备都进行振动检查。 Machinery vibration should be checked for all equipment on board during sea trials. VMW437 系泊及试航试验大纲 VMW437 PROGRAM OF DOCK TRIALS AND SEA TRIALS 第143 页 共 165页 序号 试验项目:主机和可调桨航行试验 NO.: 4.1 TEST ITEM:MAIN ENGINE AND CPP SEA TRIAL 1.1 主机磨合 Running-in of main engine: 1.1.1主机要在75%负荷工况下进行大约4小时的磨合(逐步地加载) Run up the engine to 75% load for totally appr. 4 hours stepwise. 4.1.1.2主机在90% 负荷工况下运行,对主机各项参数进行检查和调整(包括冷却水、油、空气等)。 Run up engine under 90% load condition. Check and adjust each parameter for main engine (incl. cooling water, oil, air etc.) 1.1.3主机在MCR上运行,做最后的调整和检查 Running engine at MCR, the final adjustment should be carried out. 1.1.4主机负荷试验 Load test of main engine 4.1.1.5主机调整到正常状态后,按以下表格进行主机运转试验。 When main engine is adjusted to normal state, continue running test as following list: 主机航行试验及时间表 (table of main engine test and testing hours): 工

文档评论(0)

1亿VIP精品文档

相关文档