- 1、本文档共97页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
系统工程复习课件.ppt
2007 SYSTEMS ENGINEERING 2007 SYSTEMS ENGINEERING Systems Engineering Review 系统工程 Chapter 1 Introduction to Systems Engineering 1.1Attributes Characterizing Systems (1)Four Basic Attributes of the System (1) Assemblage(集合). A system consists of a number of distinguishable units (elements, components, factors, subsystems, etc.), which may be physical or conceptual, natural or artificial. For Example, Consider a university as a system for producing educated graduates. Some of the parts of the university system are structural or static components, such as university buildings. As the system is operating, these structural components usually do not change much. Operating components are dynamic and perform processing such as the professors in a university who teach students. Flow components are often material, energy, or information; but in this example, students are the parts that flow or matriculate through the university system 1.1.1Four Basic Attributes of the System (2) Relationship. Several units assembled together are merely a group or a set. For such a group to be admissible as a system, a relationship or an interaction must exist among the units. The systems point of view also recognizes that a problem and its solution have many elements or components, and there are many different relations among them. For example, grades are one mechanism(机制) for interaction between professors and students. Grades serve a purpose, intended or not. 1.1.1Four Basic Attributes of the System (3) Goal-seeking. An actual system as a whole performs a certain function or aims at single or multiple objectives. Wherever these objectives are attained at their maximum/minimum levels, system optimization is said to have been performed. An objective that is measurable by any means is called a goal/target. For example :A manufacturing system effectively converts resources of production into produced goods (products), attaining an objective that creates high utilit
您可能关注的文档
最近下载
- 人教版小学数学五年级上册知识点归纳复习.doc
- 2019年大众宝来Bora原厂维修手册电路图.pdf
- 06【龙湖】—工艺工法—33321新建造体系 1 建造技术 1.8 抹灰石膏建造技术实施指引 5:抹.docx VIP
- 2024年河北省继续医学教育公共必修课参考答案.pdf VIP
- 四川省成都市2022-2023学年六年级上学期语文期末试卷(含答案).docx VIP
- 一结构受力分析高中通用技术豫科必修技术与设计.pptx VIP
- 部编版语文五年级上学期《期末考试卷》有答案.docx
- 比的应用解决问题(专项练习)-2024-2025学年六年级上册数学人教版.docx VIP
- 通用技术技术与设计212结构受力分析教学.pptx VIP
- 神经系统疾病医学中心建设可行性报告 .pdf VIP
文档评论(0)