hbccinitialtripreport.docVIP

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
hbccinitialtripreport

HBCC Initial Trip Report Information Technology Centre (ITC) KFUPM Delegation Members: Prof. Sadiq M. Sait Director, Information Technology Center Mr. Jaweed Yazdani Manager, Computing Services Mr. Hasan Al-Salem Manager, Administrative Information Systems Mr. Asif Sayani Network Administrator Section 1 Introduction A team from the Information Technology Center (ITC) comprising Dr. Sadiq Sait Mohammad, Director, ITC, Mr. Jaweed Yazdani, CSS Manager, Mr. Hassan Al-Salem, ADIS Manager, and Mr. Asif Sayani, Network Engineer visited the Hafr Al-Baten Community College (HBCC). The trip was approved by HE the Rector upon the recommendation of the Planning Committee. The team was charged to study the current infrastructure and plan for HBCC Information Technology (IT) requirements for the next 5 years. As an initial trip report, the short-term HBCC requirements and recommendations are presented in this report. A detailed IT plan in consultation with HBCC will follow in due time after a thorough analysis. Section 2 HBCC infrastructure HBCC is currently located in campus with two major buildings. An administrative building with some labs is located adjacent to a classroom building. The faculty housing is located in 2 buildings with one of those buildings directly opposite to the college. The plan for a new larger campus for HBCC is underway and may be implemented in next 5-7 years. The KFUPM/ITC team visited all current IT infrastructure locations at HBCC. The following observations have been prepared after an initial review of the current infrastructure. Hardware Infrastructure The latest deliveries in the last one year to HBCC through ITC include 85 Pentium IV PCs, 3 powerful servers and 20 HP NC 8230 notebooks with docking stations. HBCC currently has the following hardware infrastructure: Major Hardware Office/Lab Quantity HP NC 8230 Notebooks with docking stations (January

文档评论(0)

jvdodnnv002 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档