- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
nontechnicalsummary
Non Technical Summary
Project Overview
The town of Ogulin in northern Croatia has long-held problems of wastewater and stormwater treatment and disposal. At present the majority of the households discharge their wastewater without prior treatment into septic tanks or directly into the nearby sinkholes where it enters the local groundwaters. Stormwater drainage is disposed of in a similar manner, and the increase in hard surfaces that has accompanied urbanisation has resulted in not only a considerable increase in the flow of stormwaters, but also in their levels of pollution. Heavy precipitation also commonly results in clogging of sinkholes and local flooding, which in turn impacts on local hygiene, ecology and economy.
The proposed project would involve the establishment of a 13 km trunk sewer and associated branch lines for the collection of domestic and industrial sewage effluent from the town of Ogulin and stormwater from high flood risk area. Effluent from the proposed sewer infrastructure will flow to a new tertiary wastewater treatment plant which will use biological means to treat the sewerage effluent to an acceptable standard before discharge to the groundwater environment via an adjacent sinkhole. The plant will produce a stabilised sludge, which will be disposed of to an appropriately engineered domestic landfill.
The proposed sewer system and wastewater treatment plant will be developed in a number of stages:
Phase 1: An initial trunk sewer has already been installed to collect stormwater from high risk flood areas of the town. The stormwater effluent will be pumped in phase 2 to the wastewater treatment plant, where it will be treated mechanically via an oil and sand trap before discharge to the adjacent sinkhole.
Phase 2: Under this phase further sewers will be built, together with the wastewater treatment plant to allow the treatment of wastewaters to a tertiary standard. The plant will use an activated sludge and membrane filtration me
您可能关注的文档
- newproductmanagement.doc
- newsouthwalesdepartmentofeducationandtraining.doc
- newstudyhighlightsroleofthird-partylogisticsproviders.doc
- newvocationalism.doc
- newyorkcityofficeofenvironmental.doc
- newyorkstate's.doc
- newyorkuniversity.doc
- nexanscablingsolutions.doc
- nextgenerationsciencestandardsforcaliforniapublic.doc
- nga.ip.0005_1.0.doc
- non-verbalreasoningsampletest.doc
- nopurchasenecessary.doc
- northamericantradebarrels.doc
- northernsierraairqualitymanagement.doc
- northseattlecommunitycollege.doc
- notacompletearticleandusedasa.doc
- note(deletethisstatementinthefinalcopy)insertapplicable.doc
- noteaschoolcontemplatingasignificantchangeinits.doc
- notebeforecompletingthisform,pleasecarefullyreadthe.doc
- note'black'isforeverythingunchangedfromtheprevious.doc
文档评论(0)