- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
BRITISHANDIRISHORTHOPTICSOCIETY
AGENDA
BIOS HEADS OF SERVICE MEETING
Thursday 17th May 2012 11am start
Birmingham Children’s Hospital Education Centre
Items for AOB at the end of the meeting.
Apologies and attendance
Notes of the last meeting including corrections to student items
Matters arising
Student placement and placement assessments (standing agenda item).
Modernising scientific careers and placements for these students
BIOS course for lead tutors
Visual screening (standing agenda item)
18 week pathway (standing agenda item)
Band 5 to 6 run through (standing agenda item)
AQP
Workforce Themes 2012 – results of SurveyMonkey and initial results from 2012 Workforce Survey if available
Clinical outcome – measures and collection
Website Heads debating forum
Volunteers for Chair and Secretary to National Heads of Service group
AOB
Date and time of next meeting.
BIOS and NHS changes – discussion led by Lesley-Anne Baxter
“Information and data collection for the future” presented by Lesley-Anne Baxter.
PAPERS
Appendix 1
EXTRACT FROM NOTES FROM NATIONAL HEADS OF SERVICE MEETING
Thursday 12th May 2011 at Birmingham Children’s Hospital
Response from Marie Cleary, Chair of BIOS Education Committee (shown in blue)
4. Student placement and placement assessments (standing agenda item).
The universities are still experiencing difficulties with a lack of placement sites.
Even if sites only take one student there will still be a shortage.
Small departments find it difficult to take more than one student.
Many sites find it difficult during the summer months with staff annual leave.
Options to consider:
Could small departments work with another nearby department in a hub and spoke model, or share 2 students. If this is planned, the departments should inform the BIOS education committee for approval. I have experience of this model, and am happy to discuss with anyone interested.
Could the students have shared tutorial / study time or any oth
您可能关注的文档
- 施工(单价)合同.PDF
- 施工程施工招标资格条件要求及评标办法.PDF
- 明道大学教师学经历基本资料表.PDF
- 智能停车场系统工程需求分析与施工布线规范.PDF
- 昆明市寻甸县木戛利水库新建工程竣工.PDF
- 智能球工程施工注意事项.PDF
- 杨凌职业技术学院2016年教师及专业技术人员招聘计划.PDF
- 李渡酒窖土遗址中微生物种群的鉴定与分析.PDF
- 正保远程教育集团及师资简介.doc
- 江苏中南建设集团股份有限公司关于签订产学研合作协议的公.PDF
- springbooot+vue基于java的房屋维修系统毕业论文.doc
- 中国消防救援学院《单片机系统实验》2023-2024学年第一学期期末试卷.doc
- 2025年溧阳纺织化学品项目申请.pptx
- 景区门票包销合同模板(3篇).docx
- 【股票技术指标学习指南】第七章第三节货币需要量的测算.doc
- 2025春 _ 人教版七年级英语下册【unit4】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit5】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit6】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit7】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit8】看音标写单词.doc
文档评论(0)