- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Copyright 2015 Korean Society of Civil EngineersDOI 10.1007/s12205-015-0174-x pISSN 1226-7988, eISSN 1976-3808 /12205KSCE Journal of Civil Engineering (0000) 00(0):1-10 Construction Management ?TECHNICAL NOTEPriority Analysis of Dispute Factors in Overseas Construction Based on FIDIC Contract ConditionsSang-Hee Choi? and Yea-Sang Kim??Received March 2, 2015/Accepted September 6, 2015/Published Online November 18, 2015·································································································································································································································· AbstractWith the globalization of the construction market and the recession in Korea’s construction economy, construction companies in South Korea are extending their business into new international markets. However, there are still more than a few companies that are not making due profits despite the streams of contracts available outside the country. This is because Korean construction companies are undergoing complications in the resolution process of overseas construction claims and disputes. Therefore, the present study examines research from a construction company’s perspective, based on the FIDIC Red Book, a standard form of contract that is typically used overseas for separate bid-based construction contracts. Disputable items were selected through analysis of contract documents and the final dispute factors were derived through literature reviews and interviews with experts. To determine the priority of the dispute factors suggested by the experts who are practically in charge of overseas construction contract management, an FMEA method survey was performed and feedback was received using the Delphi method. Based on the survey results, the priority of dispute factors was analyzed, and the top 10 factors were selected as preeminent key factors for potential improvement and procedural amendment. In addition, this study anal
您可能关注的文档
最近下载
- 数码摄像机-松下-AJ-D965MC说明书.pdf VIP
- 2024年巡察整改专题民主生活会个人“聚焦四个方面”对照检查材料范文2篇.docx VIP
- 人工智能对文化产业的推动.pptx VIP
- 人教版(2024)七年级上册英语教学计划(含教学进度表).docx
- 软件的项目可行性的研究的报告编写.ppt VIP
- 一种用于处理高硫高砷金矿的提金剂及其制备方法.pdf VIP
- 中国甲状腺疾病诊治指南ppt.pptx VIP
- 《中国抗癌协会甲状腺癌整合诊治指南(2022精简版)》解读PPT课件.pptx VIP
- 一种澳洲坚果种质热敏感等级的精准诊断及其缓解新梢叶片热伤害的方法.pdf VIP
- 全球常见传染病防控概述.pptx VIP
文档评论(0)