- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
至货物顶端的净距 喷头溅水盘距货物顶端距离不能小于36 in. (914 mm)。 (NFPA 13) 货物顶部要低于喷头溅水盘最小36 in. (914 mm)。 (FM 2-2) Thank you * * * * * Suspended ceilings should extend to vertical floor-to-ceiling walls or partitions. If not, eliminate storage between the edge of the ceiling the nearest sprinklers. Design suspended ceilings to withstand fire plume uplift velocity pressures of at least 3 lb/ft2 (14.4 kg/m2). * Suspended ceilings should extend to vertical floor-to-ceiling walls or partitions. If not, eliminate storage between the edge of the ceiling the nearest sprinklers. Design suspended ceilings to withstand fire plume uplift velocity pressures of at least 3 lb/ft2 (14.4 kg/m2). * If a fire starts beneath an automatic heat/smoke vent that vent operates before sprinklers do, the venting could result in a critical delay in sprinkler operation. * If it is not possible to meet 2.2.6.1, chose one of the following options to ensure proper operation of suppression mode sprinklers in buildings with ceiling-level ventilation: a) Sprinklers Beneath Vent Openings Install suppression mode sprinklers of the same type used elsewhere in the building centered in vent openings having a maximum dimension of 4.5 ft (1.37 m). This option does not apply to storage of commodities greater in hazard than cartoned unexpanded plastic, such as uncartoned plastic, aerosols or rolled tissue in buildings higher than 30 ft (9.14 m). b) Subceiling Install a subceiling under the vent and install suppression mode sprinklers below the ceiling. Locate and size the subceiling so that the air velocity at sprinklers around the subceiling does not exceed 5 ft/sec (1.52 m/sec). Maintaining air velocities at the required level may result in a large subceiling and the required vertical distances from the ceiling to the subceiling may be large. Design the subceiling to meet the requirements of section 2.2.5. c) Heat/Flame Detection Install FM Approved line-type detection or flame detection designed to shut fans down in pow
您可能关注的文档
最近下载
- 中西医结合盆底康复治疗题库答案-2025年华医网继续教育.docx VIP
- 宝石花医院检验科年员工民主测评表.docx VIP
- 房建工程竣工预验收方案(3篇).docx VIP
- 高三烹饪理论之炉台实战测试2.docx VIP
- 2025年演出经纪人演出项目收益分配中的演出项目收益分配中的国际审计分成专题试卷及解析.pdf VIP
- 《工程力学》教案 第9课 点的运动学、刚体的基本运动.docx VIP
- 课件:任脉课件.ppt
- 人工智能产业生态健康指数构建与监测体系方案.pdf VIP
- 《工程力学》教案 第11课 刚体的平面运动.docx VIP
- 8川藏铁路中段隧道顺层、山洪、泥石流、地震拟实施方案-南昌公司 - 打印.doc
原创力文档


文档评论(0)