09 capability(制程能力).pptVIP

  • 6
  • 0
  • 约1.13万字
  • 约 31页
  • 2017-03-25 发布于贵州
  • 举报
09capability(制程能力)09capability(制程能力)

Process Capability and The Standard Transform Champion Training Z-Transform Example Z-Transform Example Example Relating Z-Scores to Six Sigma Short and Long Term Process Data Short Term process data covers a relatively short period of time (less than one shift / day) consisting of 30 to 50 data points that include only common causes. Long Term process data covers a relatively long period of time (Weeks, Months) consisting of 200 or more data points that include different operators, many shifts, different pieces of equipment etc. The Z-Transform ST/LT Data A Statistical Look at ST LT Data C

文档评论(0)

1亿VIP精品文档

相关文档