EngineeringConf.ppt

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
EngineeringConf

2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005 Sheraton Gunter Hotel San Antonio, TX Using VE in Design Build Regulatory Definitions DB Final Rule – History Application VE DB A Federal Perspective Additional Resources Value Analysis/ Value Engineering Why is Design-Build different from Design Bid Build? 23 CFR Part 636 - Design Build Design-bid-build means the traditional project delivery method where design and construction are sequential steps in the project development process. Design-build contract means an agreement that provides for design and construction of improvements by a contractor or private developer. The term encompasses design-build-maintain, design-build-operate, design-build-finance and other contracts that include services in addition to design and construction. Franchise and concession agreements are included in the term if they provide for the franchisee or concessionaire to develop the project which is the subject of the agreement. Value Analysis/ Value Engineering Design Build Final Rule: 23 CFR § 627.5 (e) In the case of a Federal-aid design-build project … the (State) shall fulfill the …requirement by performing a value engineering analysis prior to the release of the Request for Proposals document. Using VE in Design Build – Florida DOT Example All projects with an estimated cost of $20 million or more shall have a minimum of one VE study conducted during project development. The estimated cost shall includes all costs associated with the project including but not limited to: Design Right of Way Construction Administrative Cost. Using VE in Design Build – Florida DOT example The VE study shall be conducted during one of the following phases of project development: Initial Concepts Comparison of Alternatives Final Design For Design Build Projects, the VE study shall be conducted prior to the release of the Reque

文档评论(0)

taotao0c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档