A350BellyFairing-HARBINSTATUS-73-XS20151120综述.pptx

A350BellyFairing-HARBINSTATUS-73-XS20151120综述

A350 Belly Fairing WORKPACKAGES STATUS 8 April 2017 Presented By : Harbin MC, Position: A350 Belly Fairing Project Manager Name: Jiang Xuesong INDEX 1. ToW status 2. Planning, ordering and delivery 3. Procurement 4. Outsourcing 5. Tooling 7. Composite – Quality, Manufacturing Engineering, Production 6. Assembly – Quality, Manufacturing Engineering, Production 8. Improvement action Master Planning –PHASE I 8 April 2017 Page 3 QTY of panel of each AC was clarified in 2015. 2016. Details should refer to PO management list. Drawing with modification is the critical milestone to achieve the pl