On completion times of networks of concurrent and sequential tasks, under revision, http.pdf

On completion times of networks of concurrent and sequential tasks, under revision, http.pdf

  1. 1、本文档共19页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
On completion times of networks of concurrent and sequential tasks, under revision, http

1 On Completion Times of Networks of Concurrent and Sequential Tasks Daniel Berleant, Jianzhong Zhang, and Gerald Sheblé Department of Electrical and Computer Engineering 2215 Coover Hall Iowa State University, Ames, Iowa 50011 Submitted to: Operations Research Subject category ? Descriptive phrase Uncertainty, deterministic ? Arithmetic on random variables Project management, PERT ? Completion times under relaxed assumptions Probability, distributions ? CDF envelopes; stochastic dominance Contact: Daniel Berleant Department of Electrical and Computer Engineering 2215 Coover Hall Iowa State University Ames, Iowa 50011 Email: berleant@ Phone: (515) 294-3959 Fax: (515) 294-8432 2 On Completion Times of Networks of Concurrent and Sequential Tasks Daniel Berleant, Jianzhong Zhang, and Gerald Sheblé Iowa State University, Ames, Iowa 50011 Abstract The problem of determining the time to complete multiple tasks that may proceed concurrently, sequentially, or both is considered. In the solution offered, each individual task completion time may be described with a number, interval, or distribution function. In the case of distribution functions, two task completion times might be independent random variables, as when the tasks are performed in different environments and proceed independently. Alternatively, completion times might be positively correlated, as when both depend on the quality of management and proceed within the same managerial environment, or they could be negatively correlated, as when resource sharing means that faster completion of one implies slower completion of the other. Finally, various factors might interact to make completion times dependent in a way that is difficult to characterize accurately. The solution offered avoids assuming that individual task completion times are independent or have any other dependency relationship. One application o

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档