网站大量收购独家精品文档,联系QQ:2885784924

IACS UR S27.pdf

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
IACS UR S27

STRENGTH REQUIREMENTS FOR FORE DECK FITTINGS AND EQUIPMENT 1. General 1.1 This UR S 27 provides strength requirements to resist green sea forces for the following items located within the forward quarter length: air pipes, ventilator pipes and their closing devices, the securing of windlasses. 1.2 For windlasses, these requirements are additional to those appertaining to the anchor and chain performance criteria of each Society. 1.3 Where mooring winches are integral with the anchor windlass, they are to be considered as part of the windlass. 2. Application 2.1 For ships that are contracted for construction on or after 1January 2004 on the exposed deck over the forward 0.25L, applicable to: All ship types of sea going service of length 80 m or more, where the height of the exposed deck in way of the item is less than 0.1L or 22 m above the summer load waterline, whichever is the lesser. 2.2 For ships that are contracted for construction prior to 1January 2004 only for air pipes, ventilator pipes and their closing devices on the exposed deck serving spaces forward of the collision bulkhead, and to spaces which extend over this line aft-wards, applicable to: Bulk carriers, ore carriers, and combination carriers (as defined in UR Z11) and general dry cargo ships (excluding container vessels, vehicle carriers, Ro-Ro ships and woodchip carriers), of length100m or more. 2.3 The ship length L is as defined in UR S2. 3. Implementation 3.1 Ships that are described in paragraph 2.1 that are contracted for construction on or after 1 January 2004 are to comply by the time of delivery. 3.2 Ships described in paragraph 2.2 that are contracted for construction prior to 1 January 2004 are to comply: i) for ships which will be 15 years of age or more on 1 January 2004 by the due date of the first intermediate or special survey after that date; ii) for ships which will be 10 years of age or more on 1 January 2004 by the due date of the first special survey after that date;

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档