网站大量收购独家精品文档,联系QQ:2885784924

LBB Analysis according to RCC-MR A16.pdf

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
LBB Analysis according to RCC-MR A16

Leak Before Break (LBB) Analysis Leak Before Break analyses are carried out for the main vessel, sodium piping and steam generator as per RCC-MR:A16. The summary of results are given below. Analysis for Main Vessel The purpose of analysis is to ensure that double ended guillotine break is not possible and hence a mechanical interaction between main vessel and safety vessel is ruled out. The critical location is a weld in the argon space near sodium free level since it is subjected to cyclically varying axial temperature gradient which is severe under safety grade decay heat removal operating cycle. Seismic loading imposes significant mechanical loadings. A part through crack length of 200 mm and depth 5 mm is assumed pessimistically, which corresponds to an electrode left in weld groove. The detectable crack size (CL ) that can permit guaranteed argon leak of 22 l/h under normal operating stress is 94 mm. The computed value for critical crack length (CG) is 375 mm for no stable tearing which has a margin of 1.25 on detectable crack length. If stable tearing up to 3 mm is permitted, CG is 1075 mm. This ensures that leak before break is justified with a comfortable margin (3). Analysis for Sodium Piping Analysis is carried out to determine the minimum pipe diameter above which leak before break can be justified. Accordingly, the secondary sodium, primary sodium purification and safety grade decay heat removal pipelines of various diameters are analysed. Upto 250 mm, standard pipes (NB) and beyond that, rolled and welded pipelines are considered. The internal pressure is 0.4 MPa for the secondary sodium pipeline. The minimum operating pressure for primary sodium purification line as well as safety grade decay heat removal lines is 0.02 MPa. The initial crack size assumed has depth equal to 0.1 x thickness and length equal to 5 x thickness. The minimum leak detection rate is derived from ASME Section XI requirement of sodium leak detection se

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档