- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
LBB Analysis according to RCC-MR A16
Leak Before Break (LBB) Analysis
Leak Before Break analyses are carried out for the main vessel, sodium piping and steam
generator as per RCC-MR:A16. The summary of results are given below.
Analysis for Main Vessel
The purpose of analysis is to ensure that double ended guillotine break is not possible and hence
a mechanical interaction between main vessel and safety vessel is ruled out. The critical location
is a weld in the argon space near sodium free level since it is subjected to cyclically varying axial
temperature gradient which is severe under safety grade decay heat removal operating cycle.
Seismic loading imposes significant mechanical loadings. A part through crack length of 200
mm and depth 5 mm is assumed pessimistically, which corresponds to an electrode left in weld
groove. The detectable crack size (CL ) that can permit guaranteed argon leak of 22 l/h under
normal operating stress is 94 mm. The computed value for critical crack length (CG) is 375 mm
for no stable tearing which has a margin of 1.25 on detectable crack length. If stable tearing up to
3 mm is permitted, CG is 1075 mm. This ensures that leak before break is justified with a
comfortable margin (3).
Analysis for Sodium Piping
Analysis is carried out to determine the minimum pipe diameter above which leak before break
can be justified. Accordingly, the secondary sodium, primary sodium purification and safety
grade decay heat removal pipelines of various diameters are analysed. Upto 250 mm, standard
pipes (NB) and beyond that, rolled and welded pipelines are considered. The internal pressure is
0.4 MPa for the secondary sodium pipeline. The minimum operating pressure for primary
sodium purification line as well as safety grade decay heat removal lines is 0.02 MPa. The initial
crack size assumed has depth equal to 0.1 x thickness and length equal to 5 x thickness. The
minimum leak detection rate is derived from ASME Section XI requirement of sodium leak
detection se
您可能关注的文档
- I have breakfast at seven o’clock.ppt
- I can swim fast.pptx
- IACS UR S27.pdf
- I)ii’i(l S. llil~ill(l111(1 l{i(ftl](l}’. (~liilllf,,,1(’t l’]()]){llsic)]l l,ill)(il i.pdf
- IAMG Newsletter NL28-29 March1982.pdf
- HyperMesh 文档2.pdf
- IAR EWSTM8工程创建.pdf
- IACS FSA General Cargo Ships - Preparatory.pdf
- iAS10gR2_sles9_install.pdf
- IBM_ISC_transforms-supply-chain-to-drive.pdf
- 幼儿园全民国家安全教育日PPT.ppt
- 文明礼仪伴我行主题班会课.ppt
- 4.2 《心有一团火,温暖众人心》课件(共26张PPT) 2024-2025学年统编版高中语文必修上册.pptx
- 大模型平民化开启“AI+医疗”新纪元.pptx
- 2《以工匠精神雕琢时代品质》 课件(共28张PPT)2024-2025学年统编版高中语文必修上册.pptx
- 3《鸿门宴》 课件 (共52张PPT)2024-2025学年统编版高中语文必修下册.pptx
- unit 2能力阅读写作拔高练-学九级英语全一册单元模块满分必刷题人教版.pdf
- 9.3 《声声慢(寻寻觅觅)》课件 (共25张PPT)2024-2025学年统编版高中语文必修上册.ppt
- “4·23世界读书日”主题教育班会-阅读启心智,知识筑梦想 课件(共27张PPT).pptx
- 4EAT 变速箱维修手册.pdf
最近下载
- DG_TJ08-40-2010:地基处理技术规范.pdf VIP
- 2024年四川省宜宾市江安区化学中考一诊试卷.doc VIP
- 2024年中考语文总复习专题06:修辞手法(附答案解析).docx
- QCT 468_汽车散热器最新标准规范.pdf
- 《基本分析与技术分析相结合的A股投资策略案例报告》6200字.doc
- 2 TNC 640 HSCI加工中心和铣车复合加工机床数控系统.pdf VIP
- 2024年四川省宜宾市江安中学中考物理一诊试卷 .docx VIP
- 节能与新能源汽车技术路线图2.0_完整下载版.pdf
- 一般现在时(第三人称单数形式_)及练习.doc VIP
- 医院医保办个人年度述职报告与医院医保办个人总结汇编.doc VIP
文档评论(0)