网站大量收购独家精品文档,联系QQ:2885784924

Cost Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant.pdf

Cost Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant.pdf

  1. 1、本文档共41页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Cost Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant

Cost Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant Beacon Power Corporation KEMA Project: BPCC.0003.002 September, 2007 Final Report Beacon Power September 2007 KEMA Project: BPCC.0003.002 Cost Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant Principal Contributors: Gerard Thijssen Johan Enslin KEMA-Inc. Project: BPCC.0003.001 Beacon Flywheel Project Under Beacon Power Contract Number: 12952 of October 13, 2006 Beacon Power Contract Funded by the US DOE Through Sandia National Laboratories September 12, 2007 Project Manager: Johan Enslin, Ph.D, Pr.Eng. KEMA Inc. - Consulting 3801 Lake Boone Trail, Suite 200 Raleigh, NC 27607 USA Ph: (919) 256-0839 ext. 105; E-Mail: Johan.Enslin@ Web: Beacon Power September 2007 KEMA Project: BPCC.0003.002 i Table of Contents EXECUTIVE SUMMARY 1 1. Introduction 4 2. Benefits of Fast Response Regulation 5 2.1 Reduction of System-wide Regulation Resources 5 2.1.1 CAISO’s ACE Smoothing Algorithm 5 2.2 Reduced CO2 Greenhouse Gas Emissions 7 2.3 Reduced Dependence on Fossil Fuel 8 2.4 Increased Peak and Base Load Generation Capacity 8 2.5 Increased Transmission Capacity and Reduced Congestion 8 2.6 Additional Reduction of Grid Losses 8 2.7 Other Potential Grid benefits of Flywheel Systems 9 2.7.1 Provision of Grid Backup and ‘Black Start’ Ancillary Services 9 2.7.2 Support of Reactive Current / Voltage Control 9 3. Cost Performance Analysis 10 3.1 Life Cycle Cost Comparison Model 10 3.2 Definition of the Hourly Regulation Cycle 10 3.3 Technologies 11 3.4 Approach 11 4. Assumptions and Approach 12 4.1 Introduction Cost Components 12 4.2 Capital Cost 13 4.3 Operational Costs 14 4.3.1 Fuel for Fossils and Electricity Losses for Flywheels and Lead Acid Batteries 14 4.3.2 Carbon Credit: Cost Associated with

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档