- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
MDT Tube Assembly Manual
MDT Tube Assembly Manual
The ATLAS MDT Group
IHEP, Beijing
May 20, 2003
Abstract
This manual describes the facilities and procedures of the
ATLAS monitored drift tube assembly at the Institute of High
Energy Physics, Beijing. It also includes the endplug assembly
procedure and the measurement of tube length and wire tension.
Contents
1 Introduction
2 Tube Assembly Facilities
3 Daily Routine Check
4 Tube Assembly Procedure
Appendix: Endplug Assembly Procedure
1 Introduction
The ATLAS group at the Institute of High Energy Physics (IHEP), the Chinese Academy of
Sciences, will construct 48 Monitored Drift Tube (MDT) chambers in the next two years.
These chambers are categorized as two different types, BEE and BIS.8, with 32 and 16
chambers respectively. The total number of tubes to be constructed is about 7000, which
requires that the tube production rate should reach 50 tubes per day. The assembled
tubes must meet high quality specifications, as summarized in table 1.
Item Specification Test method
Tube length ??L?≤250μm Indicator
Wire position ?X25μm EMMI system
Wire tension 350g±15g Measurement of
fundamental vibration model
Gas leak rate 10-8bar?l/sec Helium leak detector
Dark current 2nA DAQ-card
Table 1. Quality control specifications for MDT tubes
The task of tube assembly is to insert the endplug precisely into its position with high
quality swaging between tube and endplug, and tension the wire to desired specification.
All of the procedures are within the wiring room, part of the clean room that satisfies
the following specifications:
?clean class better than 10,000
?temperature 20OC±1OC
?relative humidity 45%±10%
2 Tube assembly facilities
The tube assembly station (fig.1) mainly consists of following facilities:
Fig.1 Wiring station
Fig.2 Eastern (left) and western (right) sides of the wiring station
?Vacuum chucks/endplug holders/swaging coils
Two vacuum chucks which hold the tube during tube w
您可能关注的文档
- LOTIS Upper Limits and the Prompt OT from GRB 990123.pdf
- Lotus Domino Designer 8.5常用代码.docx
- LOUD A 1020-NODE MICROPHONE ARRAY AND ACOUSTIC.pdf
- LOUD A 1020-node modular microphone array and beamformer for intelligent computing spaces.pdf
- loud music 练习.doc
- Loud musicmakes me tense.doc
- Loud_music_makes_me_tense1.ppt
- Lovely Professional University.pdf
- Low rank representation.pdf
- Low temperature specific heat of glasses a non-extensive approach.pdf
- ME2206(2014版)规格书.pdf
- ME4054 最新中文版(2014版).pdf
- ME8204 电源IC规格书.pdf
- Measurement 2.pdf
- Measurement and Correlation of Pressure Drop for Gas-Liquid Two-phase Flow.pdf
- Measurement of 14MeV neutron-induced prompt gamma-ray spectra.pdf
- Measurement of noise source impedance of SMPS using a two probes approach.pdf
- Measurement of Prompt Photon Cross Sections in Photoproduction at HERA.pdf
- Measurement of the Cross Section for Prompt Diphoton Production in p-pbar Collisions at sqr.pdf
- Measurements of the observed cross sections for exclusive light hadron production in e^+e^-.pdf
最近下载
- 04重载交通水泥路面设计.doc
- 年产12万吨苯乙烯精制工艺设计.docx
- 电工基础知识(全面)课件课件(完整版)160页.pptx VIP
- 装配式建筑在装配式港口码头中的应用与优化,2025年行业展望报告.docx
- 《新媒体文案创作与传播(第2版微课版)》全套教学课件.pptx
- 课题申报参考:中华优秀传统家文化融入大学生积极心理品质培育路径研究.docx VIP
- 2024年中国第三方支付行业研究报告.pdf
- 水产动物疾病学3免疫学.ppt
- 课题申报参考:中华优秀传统医德文化融入医药院校“思想道德与法治”课教学研究.docx VIP
- (高清版)DB32∕T 5040-2025 家用电梯智能化要求及验收规范.pdf VIP
原创力文档


文档评论(0)