- 3
- 0
- 约1.8万字
- 约 7页
- 2017-04-12 发布于辽宁
- 举报
distributed intelligent city street lamp monitoring and control-外文文献本科论文
Distributed Intelligent City Street Lamp Monitoring and Control
System Based onWireless Communication chip nRF401
Abstract: Traditional street lamp lighting system’s control style has disadvantage of low efficient, high cost and difficult to monitor, etc, so, it has not met modern city requirement. In order to realize distributed long distance city street lamp state automatic control in real time, we introduces a kind of wireless long distance intelligent city street lamp monitoring and control system based on SCM technology, electric power carrier communication, and wireless communication technology, etc. System is composed of upper PC, main controller, and each terminal controller. Upper PC controls main controller SCM MSP430F19, and transmits control instruction to field controller, MSP430F149 controls corresponding lighting lamp switch’s state changing by wireless transceiver nRF401. Upper PC can effectively complete wireless long distance lighting equipment control in real time. Through experiments, transmission distance can reach 1000m in maximum. In addition, we design illumination monitor equipment, which can assure lamp shut down automatically when communication network failure.
Keywords: street lamp monitoring and control; MSP430F149; nRF401; wireless communication; AT89C51; electric power carrier communication
I. INTRODUCTION
Street lamp lighting is city part of infrastructure, which plays important position at traffic safety, society security, people living, city appearance style and feature, as well as making a city strength and mature degree. Traditional street lamp controlling adopts time-controller or transformer (distribution box) to realize decentralized control, which has disadvantages of bad centralized management, and high failure rate. Due to without long distance data collection and communication function, street lamp management in real time has not been realized, so, lamp working, operation result, etc can not be centralize monitor, re
您可能关注的文档
- 21m跨度90m长厂房钢屋架设计计算书大学论文.doc
- 27米单层厂房梯型钢屋架课程设计正文论文大学论文.doc
- 30℃时水吸收二氧化硫填料塔的设计课程设计正文论文报告大学论文.doc
- 30mw机组燃煤锅炉袋式任务书本科论文.doc
- 30万吨年焦油加工项目 设计方案大学论文.doc
- 30万吨年感光不锈钢生产项目投资计划书本科论文.doc
- 30万立方米污水处理厂 施组设计大学论文.doc
- 35kv工厂降压电气系统设计本科论文.doc
- 20万吨年醋酸原料气制备设备吊装方案本科论文.doc
- 35kv降压站 施组设计大学论文.doc
- dlp大屏幕拼接显示系统规划 设计方案大学论文.doc
- dvd仿真程序设计面向对象程序课程设计说明书本科论文.doc
- dspbuilder的am2ask2fsk信号调制的实现论文本科论文.doc
- ea111发动机缸体加工工艺的研究本科论文.doc
- eas-保护盒锁条塑料模具设计与制造本科论文.doc
- eda基于vhdl语言的出租车计价器-课程设计本科论文.doc
- email客户端的分析与实现本科论文.doc
- eg01发动机下缸体加工工艺的研究大学论文.doc
- ep3sl150的fpga硬件电路系统设计和延时细分算法与fpga实现改基于fpga的相控阵延迟聚焦算法的实现本科论文.doc
- eq1091离合器设计本科论文.doc
原创力文档

文档评论(0)