- 1、本文档共57页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
costaccttestbankchapter8
PAGE 57
Copyright ? 2012 Pearson Education, Inc.
Cost Accounting, 14e (Horngren/Datar/Rajan)
Chapter 18 Spoilage, Rework, and Scrap
Objective 18.1
1) Managers often cite reductions in the costs of spoilage as a(n):
A) major justification for implementing a just-in-time production system
B) measurement of improved output quality
C) immaterial item that is not to be tracked
D) indication of improvement in the accounting system
Answer: A
Diff: 2
Terms: spoilage
Objective: 1
AACSB: Analytical skills
2) Unacceptable units of production that are discarded or sold for reduced prices are referred to as:
A) reworked units
B) spoilage
C) scrap
D) defective units
Answer: B
Diff: 1
Terms: spoilage
Objective: 1
AACSB: Ethical reasoning
3) Unacceptable units of production that are subsequently repaired and sold as acceptable finished goods are:
A) reworked units
B) spoilage
C) scrap
D) defective units
Answer: A
Diff: 1
Terms: rework
Objective: 1
AACSB: Reflective thinking
4) Costs of poor quality production include the:
A) opportunity cost of the plant and workers
B) effect on current customers
C) effect on potential customers
D) All of these answers are correct.
Answer: D
Diff: 2
Terms: spoilage
Objective: 1
AACSB: Reflective thinking
5) Material left over when making a product is referred to as:
A) reworked units
B) spoilage
C) scrap
D) defective units
Answer: C
Diff: 1
Terms: scrap
Objective: 1
AACSB: Reflective thinking
6) A production process which involves spoilage and rework occurs in:
A) the manufacture of high precision tools
B) semiconductor units
C) the manufacture of clothing
D) All of these answers are correct.
Answer: A
Diff: 2
Terms: spoilage, rework
Objective: 1
AACSB: Reflective thinking
7) Some amounts of spoilage, rework, or scrap are inherent in many production processes.
Answer: TRUE
Diff: 2
Terms: spoilage
Objective: 1
AACSB: Analytical skills
8) An item classified as spoilage has no value.
Answ
您可能关注的文档
- cisco-最新题库.doc
- Cisco,-,最新题库.doc
- Ch点估计习题课.doc
- CJJT-城镇燃气标志标准.doc
- CIWMBAgendaItem-June-,.doc
- cisco网络专题教程-.doc
- ck会计英语讲义.doc
- clan-surname-branch.doc
- ClassicalCAlgorithm.doc
- claudianhandout.doc
- 人教版九年级英语全一册单元速记•巧练Unit13【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit9【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit11【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit14【单元测试·提升卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit8【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit4【单元测试·提升卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit13【单元测试·基础卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit7【速记清单】(原卷版+解析).docx
- 苏教版五年级上册数学分层作业设计 2.2 三角形的面积(附答案).docx
- 人教版九年级英语全一册单元速记•巧练Unit12【单元测试·基础卷】(原卷版+解析).docx
文档评论(0)