- 1、本文档共18页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
1. Which of the following is an example of corrective action in risk management?
A. Conducting a risk audit
B. Engaging in additional risk response planning
C. Performing the contingency plan
D. Conducting a risk review
以下哪一项是风险管理中纠正行动的例子?
A. 进行风险审核
B. 进行额外的风险应对规划
C. 执行应急计划
D. 进行风险审查
2.The three attributes of project risk are ( ), ( ), and ( ).
A. what might happen, who happens to, and how much will it cost
B. notification, frequency of relevant events, probability of occurrence
C. quality risk planning total number of risk events
D. the risk event, probability of occurrence, the amount at stake
项目风险的三个属性是( )、( )和( )
A.可能发生什么、发生在谁身上、造成多少成本
B.告示、相关事件的频率、发生概率
C.质量、风险计划编制、风险事件的总数量
D.风险事件、发生概率、受威胁的金额
3.Risk tolerance are dedermined to
A. help the team rank the project risks
B. help the project manager estimate the project
C. help the team schedule the project
D. help management know how other management will act on project
确定风险的承受力是用以
A.协助团队对项目的风险程度分级
B.协助项目经理估计项目
C.协助团队安排项目进度
D.协助管理层了解其他经理是如何参与项目的
4.Management reserve is used for——
A. Risks that are identified at the outset of the project
B. Risks that are not identified at the outset of the project but are known before they occur
C. Risks that cannot be known before they occur because they are external risks
D. Any risks that cannot be known before they occur
管理储备是用于
A. 项目开始时被识别的风险
B. 项目开始时未被识别,但在发生前被识别的风险
C. 在发生前不可能知道的外部风险
D. 任何在发生前不可能知道的风险
5.In general,at which point in schedule significant risk may occur?
A. Path convergence
B. Path Divergence
C. Imposed dates
D. Milestones
通常,重大风险将发生在进度哪个点上?
A. 路径汇聚
B. 路径分散
C. 强制时间
D. 里程碑
6. A project manager’s main risk-handling strategy is to accept risks. The project manager is
therefore:
A. a risk assumption tester.
B. risk averse.
C. risk seeking.
D. risk deflector.
6. 一名项目经理应对风险的主要策略是接受风险.因此,该项目经理:
A.试验风险假设条件.
B.讨厌风险.
C.敢于冒风险.
D.转移风险.
7.an individual’s willingness to take a risk can be determined by
A. decision tree modeling
B. monte carlo method
C. sensitivity analysis
D. u
您可能关注的文档
- 安装工程量计算规则题材.doc
- 铁的重要化合物答辩.ppt
- 安装规范及验收题材.doc
- 安装施工作业指导书题材.doc
- 安装使用说明书InstallationandOperationManual题材.doc
- PCB焊盘与孔设计规范(new)题材.doc
- 安装协作队伍操作规范题材.doc
- 安装原理(第3次)题材.doc
- CTT2000LM用户手册(维护分册)题材.doc
- PCB基础知识培训_布局布线_可生产性设计题材.doc
- 中国行业标准 DB/T 100-2024区域性地震安全性评价.pdf
- 《GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架》.pdf
- GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架.pdf
- DB/T 100-2024区域性地震安全性评价.pdf
- 中国行业标准 GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架.pdf
- 校园周边书店阅读氛围对初中生阅读素养提升的影响研究教学研究课题报告.docx
- 初中校园餐饮卫生监管与食品安全教育创新模式研究教学研究课题报告.docx
- 《文化遗产保护与旅游开发平衡机制的法律法规完善研究》教学研究课题报告.docx
- 《农作物病虫害生物防治技术的经济效益与社会影响分析》教学研究课题报告.docx
- 1 剖宫产术后子宫瘢痕憩室治疗中的并发症预防与护理措施教学研究课题报告.docx
文档评论(0)