The main bod construction stage of level measurementThe main body construction stage of level measurement
The main body construction stage of level measurement
1, to the construction drawings given elevation as level elevation according to 0.00 mm, irfpa from building to building measurement and transmission parts, upward elevator well, pipe well inside the wall (not less than two) be clearly marked as upward putright elevation according to the structure construction, each floor elevation to basis as an original point in the 50 m steel rule after check up measurement, and tag them as the layer of the level elevation.
2, this project because the area is larger, putright points based on multiple level in the construction, so we must adopt closed legal check multiple levels according to some rules construction survey.
6.2.1.1.6 building settlement observation
Building settlement observation to execute the ministry of construction building deformation measurement procedures JGJ8-2007. According to the deformation measurement level 2 technical requirements. (note: the procedures article at 2.0.5 regulation, primary sedimentation observation point elevation difference error ≦ 0.15 mm, height of secondary sedimentation observation point error ≦ 0.50 mm, consider instrument rating on the construction site, in accordance with the requirements for measuring secondary sedimentation observation)
6.2.1.1.6.1 point layout
Point layout as shown in the settlement observation point layout table.
The name of the point request number
Reference point deformation influence beyond, to long-term preservation of stable position monitoring point 2
Work basis points close to the observation point, easy observation of a stable position since settlement observation point 4
Observation point can reflect the characteristics of the building settlement points to determine the building settlement
Using the known level point or settlement has stable buildings built. Scene four heads of leveling points as a work basis points. Outside the observation point layout in building large Angle and eav
您可能关注的文档
- 5-英语专业四级词汇语法导--词汇篇5-英语专业四级词汇语法辅导--词汇篇.ppt
- 新时期财税制度改革的若重大问题试卷答案(81分)主讲人:许正中新时期财税制度改革的若干重大问题试卷答案(81分)主讲人:许正中.doc
- 513节能管理标准513能管理标准.doc
- 59462_09年二级建师《建设工程施工管理》练习题汇总59462_09年二级建造师《建设工程施工管理》练习题汇总.doc
- 5S法在手术室专科手术间理中的应用5S法在手术室专科手术间管理中的应用.doc
- 5W1H分析法详情5W1分析法详情.doc
- 5W2H分析法又叫七何分法5W2H分析法又叫七何分析法.doc
- 新教材八(下)期末复习卷(六)2014.5--八社政新教材八(下)期末复习试卷(六)2014.5--八社政.doc
- 新月派是现代新诗史上一重要的诗歌流派新月派是现代新诗史上一个重要的诗歌流派.doc
- 5压浆封锚作业指导书5压封锚作业指导书.doc
文档评论(0)