The main bod construction stage of level measurementThe main body construction stage of level measurement.doc

The main bod construction stage of level measurementThe main body construction stage of level measurement.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
The main bod construction stage of level measurementThe main body construction stage of level measurement

The main body construction stage of level measurement 1, to the construction drawings given elevation as level elevation according to 0.00 mm, irfpa from building to building measurement and transmission parts, upward elevator well, pipe well inside the wall (not less than two) be clearly marked as upward putright elevation according to the structure construction, each floor elevation to basis as an original point in the 50 m steel rule after check up measurement, and tag them as the layer of the level elevation. 2, this project because the area is larger, putright points based on multiple level in the construction, so we must adopt closed legal check multiple levels according to some rules construction survey. 6.2.1.1.6 building settlement observation Building settlement observation to execute the ministry of construction building deformation measurement procedures JGJ8-2007. According to the deformation measurement level 2 technical requirements. (note: the procedures article at 2.0.5 regulation, primary sedimentation observation point elevation difference error ≦ 0.15 mm, height of secondary sedimentation observation point error ≦ 0.50 mm, consider instrument rating on the construction site, in accordance with the requirements for measuring secondary sedimentation observation) 6.2.1.1.6.1 point layout Point layout as shown in the settlement observation point layout table. The name of the point request number Reference point deformation influence beyond, to long-term preservation of stable position monitoring point 2 Work basis points close to the observation point, easy observation of a stable position since settlement observation point 4 Observation point can reflect the characteristics of the building settlement points to determine the building settlement Using the known level point or settlement has stable buildings built. Scene four heads of leveling points as a work basis points. Outside the observation point layout in building large Angle and eav

您可能关注的文档

文档评论(0)

zyongwxiaj8 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档