carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs
您可能关注的文档
- 0evjfm财务_报表专业英语词汇.doc
- 0Kpqp《现代职业人士必备技能训练》(DOC 9).doc
- 0noidwo会计毕业论文-现行经济环境下会计计量模式的探讨.doc
- 0Wceh08工程地质复习题库-答案.doc
- 0Xdtne2010年中级经济师《人力资源管理专业知识与实务》模拟题.doc
- 0Xgsyc2010年最实用的经济管理资源共享集(免费下载)006.doc
- 0Xhnos2010年注册会计师考试审计教材第三章03.doc
- 0Yiuv0FMGP往事追忆_财务报表专业英语词汇.doc
- 0化必修2第二章__化学反应与能量试题及答案.doc
- 1 业工程导论.doc
- 长沙理工大学城南学院《通用人文社科英语听说(下)》2021-2022学年第一学期期末试卷.doc
- IXU上海埃诚攸微电子有限公司用户手册IU5098E ESOP10L说明书用户手册.pdf
- 2026年图书馆年终工作总结范本.pptx
- 悬挑脚手架工程施工方案.docx
- 2026年泵站运行工技能竞赛题库及答案.docx
- 学校安全应急预案修订工作记录.docx
- 陕西学前师范学院《歌曲写作》2023-2024学年第一学期期末试卷.doc
- 四川省眉山市东坡区东坡区东坡中学2024-2025学年九上化学期末调研模拟试题含解析.doc
- 吉林农业科技学院《乐谱制作》2023-2024学年第二学期期末试卷.doc
- 2026年图书馆年终工作总结PPT.pptx
最近下载
- 2009雷克萨斯gs450h原厂维修手册中文as ns.pdf VIP
- 雷克萨斯gs450h原厂维修手册中文.pdf VIP
- 初中物理电学中考试题.docx VIP
- 语言学概论(第二版) 作者 岑运强 著 第7章 交叉语言学.ppt VIP
- 年组装储能宝80万套、检测分类循环电池100万套技改环评报告.pdf VIP
- 2026年中考英语复习必备单词词汇表(精校打印版).pdf VIP
- 七升八语文暑假提升--复习-专题04 古诗文阅读.pdf VIP
- 2025年南充市国企考试真题.docx VIP
- 2025年南充市嘉陵区国企考试真题.docx VIP
- 高考物理力学计算题训练含答案.docx VIP
原创力文档

文档评论(0)