- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《多体信息加工》主题单元设计
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 《个与团队管理》课程模拟题二解.doc
- 《个与团队管理》讲义.docx
- 《个与团队管理》试题及答案.doc
- 《个与团队管理》课程模拟题二解析版.doc
- 《中企业管理》形成性考核作业题.doc
- 《中国广告案例鉴》购书说明.doc
- 《中学校财务制度》讲解一.doc
- 《中学术期刊光盘版检索与评价数据规范》修订版.doc
- 《中学校财务制度》讲解五.doc
- 《中商务写字楼指数》第季度.docx
- 统编版语文二年级下册 13 画杨桃【新课标版】 课件.pptx
- 统编版语文三年级上册 1 大青树下的小学【精华 教案版】课件.pptx
- 统编版语文三年级上册 4 古诗三首【新课标版】课件.pptx
- DB32_T 5162-2025 健康县(市、区)建设规范_可搜索.pdf
- T_CPSS 1005-2025 构网型光伏发电站接入电网技术规范.pdf
- DB32_T 5160-2025 传媒行业数据分类分级指南_可搜索.pdf
- DB14_T 3553—2025 煤矿用液压支架电液控制系统常态化运行保障技术规范.pdf
- DB14_T 3549—2025 负荷类虚拟电厂功率调节能力测试技术规范.pdf
- DB32_T 5156-2025 零碳园区建设指南.pdf
- DB14_T 3550—2025 煤炭洗选企业数据管理规范.pdf
文档评论(0)