carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 公司基础观点汇总.doc
- 公司场部职责及岗位职责.doc
- 公司堂管理制度最新.doc
- 公司员工入职培训方案.doc
- 公司工奖惩制度大全.doc
- 公司工工装管理办法.doc
- 公司工招聘流程与管理制度.docx
- 公司工晋升管理制度.doc
- 公司工招聘管理制度.doc
- 公司工岗位晋升管理制度.doc
- 人工智能技术在小学个性化学习资源版权管理中的应用与挑战教学研究课题报告.docx
- 校园周边流动摊贩对学校环境的影响及整治措施教学研究课题报告.docx
- 2025年国家实验室建设人才需求预测及未来五年发展趋势报告.docx
- 2025年卫星通信卫星遥感与地球观测产业发展报告.docx
- 2025年城市更新与产业发展分析报告.docx
- 2025年国家实验室建设投入分析及未来五至十年产业布局报告.docx
- 2025年城市燃气安全监管政策对行业发展影响报告.docx
- 《大气污染联防联控机制下区域协同治理政策实施效果评价及改进建议》教学研究课题报告.docx
- 2025年医药企业市场准入策略与政策法规匹配分析:行业前景展望.docx
- DB14_T 811-2013 盐碱地玉米垄植膜下滴灌栽培技术规程.docx
最近下载
- 《施工企业安全生产评价标准》JGJT77-2024.doc VIP
- 郴州市北湖区招聘事业单位工作人员笔试真题2024.docx VIP
- 中国铁路总公司《普速铁路线路修理规则》2023-01.pptx VIP
- 中国信通院:数字政府建设发展研究报告(2024年).pdf VIP
- 农业科研事业单位内部控制.docx VIP
- 铁路路基施工规范.pdf VIP
- 第2课 古代希腊罗马(新教材课件)-【中职专用】《世界历史》同步精品课堂(高教版2023•基础模块).pptx VIP
- NADCA压铸手册资料.pdf VIP
- 企业新三板上市财务尽职调查报告 事务所财务尽职调查报告模板.doc VIP
- 14S501-1 球墨铸铁单层井盖及踏步施工(OCR).pdf VIP
文档评论(0)