carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
最近下载
- 佳能5D4中文使用说明书.pptx VIP
- T_SXNA 002-2021_陕西省消毒供应中心达标验收标准.pdf
- 2025年武汉江岸区公开招聘社区干事24人笔试备考题库及答案解析.docx VIP
- 20250616-高盛-亚洲经济分析:中国的新增住房需求将保持低迷.docx VIP
- 濒危野生植物及其制品物种鉴定规范.pdf VIP
- 默纳克ME320L电梯专用变频器说明书.pdf
- 20S517- 排水管道出水口.pdf VIP
- 某集团有限公司绩效考核详细手册.docx VIP
- 东北林业大学《高等数学Ⅱ》2025-----2026学年期末试卷(A卷).docx
- 茶楼股东合作协议8篇.docx VIP
文档评论(0)