- 1、本文档共37页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 医院息系统软件开发采购需求.doc
- 医院排水设计及施工要点.doc
- 医院政后勤人员绩效考核管理办法.doc
- 医院务管理制度.doc
- 医院息管理系统.doc
- 医院略薪酬体系设计的研究概述.doc
- 医院效考核工作方案.doc
- 医院效管理实施方案.doc
- 医院政谈话制度.doc
- 医院章使用管理制度及附件.doc
- 二手奢侈品平台二手商品交易平台风险防控报告.docx
- 聚焦2025年,危旧房改造工程社会稳定风险评估与风险控制报告.docx
- 二手奢侈品平台个性化推荐系统应用研究报告.docx
- 数字化技术在零售门店:2025年智能货架与商品陈列技术报告.docx
- 2025年清廉主题班会小学五年.pptx
- 2025年餐饮行业供应链金融创新报告.docx
- 二手奢侈品平台奢侈品二手市场奢侈品鉴定技术发展趋势报告.docx
- 康复医疗器械市场发展现状与未来趋势预测分析报告:2025年产品创新与需求展望.docx
- 2025年食品加工行业节能减排技术政策解读与应对策略报告.docx
- 特岗教师练习题含答案详解【预热题】.docx
文档评论(0)