- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 商洛教育科学规划课题成果鉴定书.doc
- 啤酒域销售手册.doc
- 喜来酒店喜达屋酒店管理集团Starwood人力资源部政策、标准及程序.doc
- 商铺售方案之策略篇.doc
- 商标理广告营销会计常用词汇.doc
- 商贸营管理部总体职责.doc
- 喜来酒店质量管理程序.doc
- 商铺售方案之策略篇.doc
- 喜来员工手册及管理体系.doc
- 喜达企业结业论文.doc
- 2025年能源互联网视角下分布式能源交易模式创新分析报告.docx
- 2025年基层医疗卫生机构信息化建设中的医疗信息化与医疗信息化产业市场分析报告.docx
- 2025年汽车行业芯片短缺应对策略与汽车行业产业链全球化发展报告.docx
- 2025年数字艺术展览数字艺术作品展示效果评估体系报告.docx
- 2025年数字艺术展览展示内容创新与观众体验深度报告.docx
- 工业节能技术改造在制造业中的应用与推广研究.docx
- 医学新科技介绍.pptx
- 工业节能技术改造在医药行业中的应用现状与前景分析报告.docx
- 2025年生态修复生物多样性保护与生态修复产业政策实施效果分析报告.docx
- 工业节能技术改造在工业生产中的节能降耗效果与挑战报告.docx
文档评论(0)