- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
63-英译-贵州黄花寨水电站大坝砼自身体积变形特性分析(格式修改)
Analysis on the Dam Concrete Self-Volume Deformation Behaviors of GuizhouHuanghuazhai Hydropower Station
Chen Xuemao1 Pang Xianming2
Institute of Civil Engineering and Mechanics Guizhou Dam Safety Monitoring Center
Huazhong University of Science and Technology
Wuhan, Hubei Province 430074 PR China Guiyang, Guizhou Province 550002 PR China
Abstract—Total reservoir capacity of Guizhou Huanghuazhai Hydropower Station is 174.8 million m3, the maximum dam height is 110.0 m, totally concrete pouring of 2.8 million m3; the dam, adopted the MgO technology admixed in the cement plant, has become another RCC arched one adopted the rapid construction method in our province. This dam started to construct in Feb 2007 and completed in Apr 2011; formally stored water on Oct 18, 2010, and reached maximum storage level at the elevation of 780.30m on Feb 17, 2011. Since the dam construction to being put into operation, considerable complete observation data have been obtained; this paper mainly makes a systematic analysis on the observation data for the dam concrete self-volume deformation, so as to conduct a preliminary assessment on concrete self-volume deformation behaviors of the Huanghuazhai RCC arched dam.
Keywords- Huanghuazhai RCC arch dam MgO admixed in the concrete Self-volume deformation
Introduction
Huanghuazhai Hydropower Station, located in Duncao Township, Changshun County, Qiannan Autonomous Prefecture, Guizhou Province, is the 3rd cascade hydropower station on the main Getu River along the Mengjiang River drainage basin. The drainage area above the dam site is 2163km2, mean annual flow is 41.0 m3/s. The normal storage level of the reservoir is 795.5 m, dead water level is 770m and gross reservoir capacity is 174.8 million m3. The installed capacity of the station is 2 ? 30MW, the guaranteed output is 12.96 MW
您可能关注的文档
最近下载
- 人教版数学五年级上册教学计划及进度表.doc VIP
- 昆山通海中学小升初考试试卷.docx VIP
- 交警基本法律知识.pptx VIP
- 2025下半年湖南省国际工程咨询集团有限公司社会招聘34人笔试模拟试题及答案解析.docx VIP
- 2025年海南三亚市天涯区教育系统招聘幼儿园编制教师16人(第1号)笔试历年典型考题(历年真题考点)解题思路附带答案详解(5套).docx
- 旅游美学——第三章-审美心理.pptx VIP
- 《永冻土地区场道工程技术》课程教学大纲模板课程教学大纲.doc VIP
- 考研英语单词表汇总(5500).doc VIP
- 2025下半年湖南省国际工程咨询集团有限公司社会招聘34人笔试备考题库及答案解析.docx VIP
- 人教版(2024)七年级美术上册第二单元第2课《科技之光》精品课件.pptx VIP
文档评论(0)